Band Trailers , District - Wide
The scope, dates and status of this tender. A free account opens every field.
Source: California Purchasing Group
1 . Vendor must source a High Cube Kentucky ™ “ Moving Van ” Semi - Trailer a . Trailer to be DOT certified ( current FHWA inspection sticker ) b . VIN TBD c . 53 ’ trailer length d . Door configuration varies , but will have a minimum of 3 doors curb - side , 1 door street - side e . Logistics posts on 16 ” center
- Status
- Closed
- Sector
- Stadium, Metal, Energy Storage, Wind, Power Generation (CCGT), Warehouse, Steel, Commercial, Road
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about Band Trailers , District - Wide
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . Vendor must source a High Cube Kentucky ™ “ Moving Van ” Semi - Trailer a . Trailer to be DOT certified ( current FHWA inspection sticker ) b . VIN TBD c . 53 ’ trailer length d . Door configuration varies , but will have a minimum of 3 doors curb - side , 1 door street - side e . Logistics posts on 16 ” centers f . Interior sidewall height is 120 ” g . Rear swing doors h . Belly box configurations varies , but will have a minimum of 2 belly box doors on each side 2 . Trailer Specifications a . Translucent roof b . Skin patches and repairs where necessary c . Corrosion mitigation d . ABS Certified including wheel sensors , wiring , module / controller i . ABS self - test including ABS light illumination verified e . New hub caps , sight glasses and gaskets f . Electrical system and lighting components including outdoor and indoor lighting g . Glad hand seals at service panel h . 7 pin receptacles at service panel i . Proper operation of brake slack adjusters j . Proper landing leg operation k . Drōv automatic tire - Inflation system with trailer - mounted alert light l . Interior nose , ceiling drop step face , and the inside of the rear doors painted white m . Floor to have a fresh coat of polyurethane applied on existing floor n . Prepare trailer exterior for new paint o . Single color painting of exterior , ( no pearl or metallic ) paint color to be chosen to compliment the graphic p . Outer wheel hubs , prepped , and painted white q . Landing gear painted with a textured black r . Holdbacks ( wind latches ) for exterior doors and belly boxes reinstalled or replaced as necessary s . New DOT conspicuity tape 3 . Graphics a . Graphics printed and installed from files created in concert with vendors Media Manager b . Graphics template will be finalized based on the dimensions of the trailer c . Vinyl all 4 sides d . Full - color digitally printed graphics on 3M ™ vinyl with an MCS ™ warranty e . Film topcoat for durability and UV resistance to color fade 4 . Access a . Power retracting stairs from the ground to the nose floor in the # 1 curb - side door – All aluminum construction b . Full - width powered ramp i . Ramp length is 15 feet ii . Ramp capacity is 1 , 000 pounds with custom plank extrusions for high - grip 5 . Buildout a . Second floor above the main deck . i . Upper deck to be 28 feet long and will begin at the nose deck step with a split stair ii . Industry standard load bars and ¾ ” plywood decking iii . High durability commercial carpet on the second floor iv . Custom door spans to allow all door openings to be fully functional v . Floor - to - floor dimension to be 45 ” with 41 ½ “ clear below the second floor b . Fixed stairs from the nose deck to the second floor – All aluminum construction c . Powered retracting stairs from the main floor to the upper deck at the tail - end of the upper deck floor – All aluminum construction d . Barn - door railing and gate on the street - side upper deck if trailer is barn door equipped i . If 52 ” doors then door bars . All aluminum construction with 60X30 mesh safety gate ii . Electrically actuated elevator through the street aft door for lift of heavier instrument cases up to 100 lbs . e . Drum Wall & Carrier Grid i . Shelves for cased battery percussion to accommodate up to a 10 - 5 - 6 instrumentation ii . Each shelf will be beveled back to the wall 5 degrees and covered in an open loop carpet 1 . Installation of the “ Carrier ” from the ceiling of the nose deck , will accommodate 24 drum carriers f . Instrument Shelves i . 3 sections of 6 - foot instrument shelves ii . Each shelf will be beveled back to the wall 5 degrees and covered in an open loop carpet iii . Each individual 6 ’ shelf can accommodate a combination of 5 baritones or mellophones in cases g . Guard Drawers i . A pair of eight foot wide by 4 foot deep drawers on full extension drawer slides ii . Installed in the street side belly boxes |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Stadium, Metal, Energy Storage, Wind, Power Generation (CCGT), Warehouse, Steel, Commercial, Road |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Stadium tenders in United States of America
- Graphic Designer Request for Proposals
- Electric CostofService Analysis Rate Design Study
- RFQ 933002022JM Roof Drain at Scope Arena Unclogging and Cleaning Services
- 23B38LL Ocean Center Floor Boxes
- 0.51 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter, sidewalk and ramps and pavement markings on Howard Street from Stadium Drive to Oakland Drive in the city of Kalamazoo, Kalamazoo County. This is a Local Agency project. 4.00 % DBE participation required
- Resurfacing and intersection improvements on Court Street from Stadium Drive to Hilltop Drive in Pekin.
- HMA resurfacing with pavement patching, dowel bar retrofitting, thermoplastic pavement markings and signage on University Drive from University Park Drive to Stadium Drive on the SIU Campus in Edwardsville.
- HMA resurfacing with pavement patching, dowel bar retrofitting, thermoplastic pavement markings and signage on University Drive from University Park Drive to Stadium Drive on the SIU Campus in Edwardsville.
