Bankable Wind Date
The scope, dates and status of this tender. A free account opens every field.
Source: Find a Tender Service (UK)
Yorkshire Water (YW) and Kelda are seeking to engage the market to discuss their planned deployment of new on-shore wind turbines - specifically regarding bankable wind data without the requirement for 12 month Met Mast or LiDAR campaigns. Work done to date indicates deployments of 1-3 turbines at each location, with 7 sites under consideration initially plus 2 repowering sites. As YW and Kelda lo
- Status
- Prospective
- Sector
- Water Supply and Storage, Wind, Power Generation (CCGT), Raw Materials
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Find a Tender Service (UK)
ConstructChat
Ask ConstructChat about Bankable Wind Date
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | planning |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Yorkshire Water (YW) and Kelda are seeking to engage the market to discuss their planned deployment of new on-shore wind turbines - specifically regarding bankable wind data without the requirement for 12 month Met Mast or LiDAR campaigns. Work done to date indicates deployments of 1-3 turbines at each location, with 7 sites under consideration initially plus 2 repowering sites. As YW and Kelda look to expand this programme, they anticipate a small scale wind development programme in addition. The deployments would be on YW operational land and would directly power the adjacent operational site, offsetting grid purchased power. The purpose of this notice is to open discussion with wind data analysts, modellers and providers. We would like to work with wind data specialists with a proven track record of securing wind turbine project finance having used modelled wind data, processed into a bankable format, without a 12 month LiDAR or Met Mast campaign. Data must include: - Annual Average(mean) wind speed (at hub height) - Once in 50 years 3 seconds maximum wind gust - Weibull Shape factor k - Wind shear index IEC alpha - Characteristic turbulence at 15m/s, or the full turbulence graph - Wind farm output at P50/P90 levels (gross and net yield) The following can be provided: - Wind turbine locations - Wind turbines hub heights - Wind turbine makes and models - Any other relevant data YW and Kelda are looking to partner with a single data provider who can provide bankable wind data which will be used for accurate financial modelling and securing project finance. |
Location
Country | United Kingdom (UK) |
Source
Source | Find a Tender Service (UK) |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Wind, Power Generation (CCGT), Raw Materials |
Article published date | 2026-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United Kingdom
- District Heating Network Performance, Operational Monitoring and Planned Maintenance Services
- Swiftwater and Flood Boat Rescue Operator Training
- Sewer Mapping
- Technology Services Partner Framework (TSPF)
- Technology Services Partner Framework (TSPF)
- Provision and installation of burial vaults
- Diagnostic and Capital Equipment and Related Accessories and Services
- Wheal Jane - Reaction Chamber Mixing Tanks VSDs
