logo

Bankable Wind Date

The scope, dates and status of this tender. A free account opens every field.

Source: Find a Tender Service (UK)

Tender
Planning

Yorkshire Water (YW) and Kelda are seeking to engage the market to discuss their planned deployment of new on-shore wind turbines - specifically regarding bankable wind data without the requirement for 12 month Met Mast or LiDAR campaigns. Work done to date indicates deployments of 1-3 turbines at each location, with 7 sites under consideration initially plus 2 repowering sites. As YW and Kelda lo

Status
Prospective
Sector
Water Supply and Storage, Wind, Power Generation (CCGT), Raw Materials
Location
United Kingdom
Updated
3 Nov 2026
Source
Find a Tender Service (UK)

ConstructChat

Ask ConstructChat about Bankable Wind Date

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Bankable Wind Date” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

planning

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Yorkshire Water (YW) and Kelda are seeking to engage the market to discuss their planned deployment of new on-shore wind turbines - specifically regarding bankable wind data without the requirement for 12 month Met Mast or LiDAR campaigns. Work done to date indicates deployments of 1-3 turbines at each location, with 7 sites under consideration initially plus 2 repowering sites. As YW and Kelda look to expand this programme, they anticipate a small scale wind development programme in addition. The deployments would be on YW operational land and would directly power the adjacent operational site, offsetting grid purchased power. The purpose of this notice is to open discussion with wind data analysts, modellers and providers. We would like to work with wind data specialists with a proven track record of securing wind turbine project finance having used modelled wind data, processed into a bankable format, without a 12 month LiDAR or Met Mast campaign. Data must include: - Annual Average(mean) wind speed (at hub height) - Once in 50 years 3 seconds maximum wind gust - Weibull Shape factor k - Wind shear index IEC alpha - Characteristic turbulence at 15m/s, or the full turbulence graph - Wind farm output at P50/P90 levels (gross and net yield) The following can be provided: - Wind turbine locations - Wind turbines hub heights - Wind turbine makes and models - Any other relevant data YW and Kelda are looking to partner with a single data provider who can provide bankable wind data which will be used for accurate financial modelling and securing project finance.

Location

Country

United Kingdom (UK)

Source

Source

Find a Tender Service (UK)

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Wind, Power Generation (CCGT), Raw Materials

Article published date

2026-09-21

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender