Bard Air Conditioner Replacement W36Hy-B09
One of 10,000+ tenders Taiyo tracks in California.
Source: SAM.gov
THIS IS A NOTICE OF INTENT TO AWARD A SOLE SOURCE CONTRACT or BRAND NAME AND IS NOT A REQUEST FOR COMPETITIVE QUOTES The Purpose of request is to replace two (2) non-functioning Air Conditioning (A/C) units at the NPS remote site located at Camp Roberts, CA. Tasks: The contractor shall perform the following task(s) as follows: Procurement and installation of two (2) new 3-ton Bard W36HY-B09 Wall-M
- Status
- Prospective
- Sector
- Commercial, Manufacturing (Industrial), Aerospace & Defense, Power Generation (CCGT)
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Bard Air Conditioner Replacement W36Hy-B09
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | special notice |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | THIS IS A NOTICE OF INTENT TO AWARD A SOLE SOURCE CONTRACT or BRAND NAME AND IS NOT A REQUEST FOR COMPETITIVE QUOTES The Purpose of request is to replace two (2) non-functioning Air Conditioning (A/C) units at the NPS remote site located at Camp Roberts, CA. Tasks: The contractor shall perform the following task(s) as follows: Procurement and installation of two (2) new 3-ton Bard W36HY-B09 Wall-Mount Heat Pump packaged wall-mount heat pump systems, 230V single phase, utilizing R-454B refrigerant. Each system will include factory-approved electric backup heat strips for supplemental heating during colder outdoor conditions. Unit replacements will be performed on Building 1 and Building 2. Building two has three wall-mounted heat pumps. This will be the furthest one to the right when looking at the back of the building. Removal and disposal of existing equipment as needed, setting and securing new Bard units, reconnecting to existing incoming electrical power and existing low-voltage control wiring, pressure testing and commissioning refrigerant circuits, and verifying proper system operation. The contractor shall install the new Bard units and programmable thermostats in accordance with manufacturer specifications and all applicable codes. The contractor shall perform a full system startup and commissioning, including pressure testing, airflow/temperature verification, and demonstrating proper heating, cooling, and control functions to the on-site manager. See Notice of Intent for Additional information |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | California |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Commercial, Manufacturing (Industrial), Aerospace & Defense, Power Generation (CCGT) |
Article published date | 2026-07-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Commercial tenders in United States of America
- Sanitary Sewer Lateral Lining Pilot Program Section 230067500SA
- Trophies Plaques Awards ETC
- Painting Services for Building Exteriors Infrastructure Systems and Pressure Washing
- OAM Learning Management System
- CYBER SECURITY PENETRATION TESTING
- PROMOTIONAL ITEMS SOUVENIRS
- Proposed Services at Former Ingleside Recreation Center
- Towing Services CityOwned Vehicles Light and Heavy Duty
