logo

Barn Island Floating Dock System

Sector: Steel • Location: Connecticut, United States of America

Source: Connecticut Purchasing Group

Tender
Closed

The purpose of this ITB is to solicit a contractor to fabricate and install two ( 2 ) new floating dock systems at the Barn Island State Boat Launch in Stonington , CT . Each floating dock system shall consist of four ( 4 ) docks each measuring 20 ft long × 8 ft wide . The contractor will also be res

Status
Closed
Sector
Steel, Forest Products and Packaging
Location
Connecticut, United States of America
Updated
3 Nov 2026
Source
Connecticut Purchasing Group

ConstructChat

Ask ConstructChat about Barn Island Floating Dock System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Barn Island Floating Dock System” is a tender record in Taiyo, linked to the Steel sector. It is issued for works, goods, or services related to Connecticut, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The purpose of this ITB is to solicit a contractor to fabricate and install two ( 2 ) new floating dock systems at the Barn Island State Boat Launch in Stonington , CT . Each floating dock system shall consist of four ( 4 ) docks each measuring 20 ft long × 8 ft wide . The contractor will also be responsible for proper disposal of the previous dock systems , as well as returning any salvageable hardware to DEEP Marine Headquarters . DEEP will supply the following dock hardware : floats , pile guides , hoops , rollers , inner corner brackets , outer corner brackets , male / female corner brackets , lateral and longitudinal brackets , angle brackets , cleats , cleat angles , washer plates , PVC bumpers , stainless steel strips , pulling shackles , gangways , gangway resting plates , and tread plates . The contractor will be responsible for supplying framing lumber , decking , ground skids , fasteners , bolts , nuts , washers , and any additional materials required to fully replicate the original dock structure in layout , dimensions , configuration , materials , and functionality . If the contractor chooses to construct the docks on site , DEEP will designate a work area perimeter . * Note some construction must take place while the docks are deployed to confirm precise alignment with piles / gangways .* Additional project requirements for disposing of previous docks and returning of salvageable materials may be found in Appendix B , Statement of Work .

Location

Country

United States of America (USA)

State

Connecticut

Source

Source

Connecticut Purchasing Group

URL

More Details

Record type

Tender

Sector

Steel, Forest Products and Packaging

Article published date

2026-03-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender