Bathroom Renovation
Sector: Commercial • Location: MITN, United States of America
Source: MITN Purchasing Group
WORK CATEGORIES 020 Selective Demolition 042 Masonry 061 General Trades 092 Lath , Plaster , Drywall & Acoustical ( LPDA ) 096 Flooring 099 Painting 220 Plumbing 230 Heating , Ventilating , and Air Conditioning ( HVAC ) 260 Electrical BID CATEGORY DESCRIPTIONS Bid Categories have been established to guide bidders in dete
- Status
- Closed
- Sector
- Commercial, Cement
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Bathroom Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | WORK CATEGORIES 020 Selective Demolition 042 Masonry 061 General Trades 092 Lath , Plaster , Drywall & Acoustical ( LPDA ) 096 Flooring 099 Painting 220 Plumbing 230 Heating , Ventilating , and Air Conditioning ( HVAC ) 260 Electrical BID CATEGORY DESCRIPTIONS Bid Categories have been established to guide bidders in determining scope of work where trade jurisdiction is not clearly defined . These descriptions are not meant to be all inclusive of work to be included in the Bid . Unless specifically noted as being furnished only or install only , scope includes complete installation including all labor , material , equipment , etc . Bidders are required to familiarize themselves with ALL BID CATEGORIES AND ALTERNATES . General inclusions and information for ALL Work Categories : • All contractors shall provide permits and inspections required that are associated with their scope of work . Permitting has been delegated to the City of Big Rapids , so permits will be pulled through Big Rapids referencing the current Building Permit . • All contractors shall be responsible for the coordination , delivery , unloading , and handling of their products . GDK will not be providing means for handling and unloading of material . • For trades required to carry an allowance as part of the base bid – Additional mark - up will NOT be added to cost of work associated with Allowance work as mark - up is already included in the cost of the base bid • A “ Preliminary Project Schedule ” is being issued as part of the bid documents . This schedule is subject to change pending owner ’ s request , review with final project team , material delivery dates , and installation durations . This schedule shall be subject to change throughout the course of the project . There will be periods where manpower is required before or after school hours for transitions between phases of work . Also , certain school breaks like Spring break , will require manpower to transition from phase to phase |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Commercial, Cement |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
