Bathroom Renovations For Uscg Station Santa Barbara Residencies
The scope, dates and status of this tender. A free account opens every field.
Source: SAM.gov
INDUSTRY OPEN HOUSE SITE VISIT: January 6th at 0900. POC: Rachel Hanson: Mr. Ruijin Garcia: Note: the KO is not onsite. Please direct specific site visit questions to the POC's listed above. This project involves the corrective removal and replacement of 6 failing bathtub and shower pan assemblies that have developed cracks near the drain area due
- Status
- Closed
- Sector
- Residential, Government, Commercial
- Location
- Santa Barbara, California, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Bathroom Renovations For Uscg Station Santa Barbara Residencies
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | INDUSTRY OPEN HOUSE SITE VISIT: January 6th at 0900. POC: Rachel Hanson: rachel.n.hanson@uscg.mil Mr. Ruijin Garcia: ruijin.g.garcia@uscg.mil Note: the KO is not onsite. Please direct specific site visit questions to the POC's listed above. This project involves the corrective removal and replacement of 6 failing bathtub and shower pan assemblies that have developed cracks near the drain area due to improper installation. As part of this effort, all replacement tub and shower pan assemblies, surrounding materials and installation methods shall be standardized across all six units to ensure consistency, durability, and long-term maintenance efficiency. All housing units that require repair are currently occupied. The Contractor shall provide all labor, materials, equipment, supervision, and incidentals necessary to complete the removal and replacement of tub and shower pan units and associated systems. Work must comply with current building codes, manufacturer installation requirements, industry best practices, and project standardization requirements. All six replacements must utilize the same approved tub/pan model, surround materials, waterproofing system, hardware, and installation methodology unless otherwise directed. Please reference the attached SOW and documents to develop proposals and detailed pricing schedules. Documentation showing past performance and certifications are required. NOTE: FAR 52.212-2 The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: technical capability, past performance, and price Technical capability and past performance, when combined, are more imporant than price alone. Bids may be submitted on DHS MARKETPLACE or sent directly to the POC. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | California |
City | Santa Barbara |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Residential, Government, Commercial |
Article published date | 2026-01-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
