Battery Energy Storage System (Bess) Relocation
Sector: Residential • Location: Newburgh, New York, United States of America
Source: SAM.gov
27 July 2026 -Edited to add Questions and Answers. 21 July 2026 -Edited to add Questions and Answers. 21 July 2026 - Edited to add Wage Determination. There is NO incumbent contractor or existing contract in place for this requirement. This is a first time requirement. Relocation of a Generac Model SBE500 Battery Energy Storage System (BESS) from a contractor storage lot in the vicinity of Dover A
- Status
- Prospective
- Sector
- Residential, Commercial, Aerospace & Defense, Energy Storage, Government
- Location
- Newburgh, New York, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Battery Energy Storage System (Bess) Relocation
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 27 July 2026 -Edited to add Questions and Answers. 21 July 2026 -Edited to add Questions and Answers. 21 July 2026 - Edited to add Wage Determination. There is NO incumbent contractor or existing contract in place for this requirement. This is a first time requirement. Relocation of a Generac Model SBE500 Battery Energy Storage System (BESS) from a contractor storage lot in the vicinity of Dover Air Force Base (AFB), Delaware, to a designated site at Hanger 101, Stewart Air National Guard Base (ANGB), New York. Contractor will be responsible for, but not limited to: visually inspecting BESS and documenting, load and transfer BESS to 12550, off load BESS on dunnage provided by the contractor for BESS to ensure no damage to the ground surface. All other requirements for this project are listed in the attached Performance Work Statement (PWS). I've also attached a picture of the BESS and the spec sheets. NOTE: the contractor is responsible for loading and offloading the BESS. The government will NOT supply a crane, forklift, or any other means to perform this task. Loading and offloading the BESS is the responsibility of the contractor. |
Original sector | Not Identified |
Location
Country | United States of America (USA) |
State | New York |
City | Newburgh |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Residential, Commercial, Aerospace & Defense, Energy Storage, Government |
Article published date | 2026-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
