logo
TenderOpportunity

BBV Sublot 4 - HSST1020 - Cut & Bent Steel Reinforcement - Curzon Approach Viaducts

The scope, dates and status of this tender. A free account opens every field.

Source: Contracts Finder

This scope is for the provision of cut and bent steel reinforcement for Curzon Approach Viaducts. The supplier should review the steel reinforcement drawings and cut and bent steel in accordance with the drawings and bar bending schedules provided by the Contractor. The bars should be cut and bent at the supplier's premises and comply with the relevant BBV/HS2 specification and relevant British St

Status
Prospective
Sector
Bridge, Steel, Manufacturing (Industrial), Cement
Location
United Kingdom
Updated
3 Nov 2026
Source
Contracts Finder

ConstructChat

Ask ConstructChat about BBV Sublot 4 - HSST1020 - Cut & Bent Steel Reinforcement - Curzon Approach Viaducts

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “BBV Sublot 4 - HSST1020 - Cut & Bent Steel Reinforcement - Curzon Approach Viaducts” is a tender record in Taiyo, linked to the Bridge sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

opportunity

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

This scope is for the provision of cut and bent steel reinforcement for Curzon Approach Viaducts. The supplier should review the steel reinforcement drawings and cut and bent steel in accordance with the drawings and bar bending schedules provided by the Contractor. The bars should be cut and bent at the supplier's premises and comply with the relevant BBV/HS2 specification and relevant British Standards:• All hot rolled and cold worked steel bars shall conform to BS EN 10080 and BS 4449 Grades B500B or B500C• BS 8666 from 2005 and eventually 2020 Scheduling, dimensioning, bending and cutting of Steel Reinforcement for Concrete• The mandrel diameter for bending bars shall comply with Clause 8.3 of BS EN 1992-1-1.• CARES product acceptance scheme for steel reinforcement• Couplers shall be TA1A CARES certifiedThe supplier should also provide any couplers including threading and any relating protection of the re-bars. Bars should be delivered to site labelled with the references of the bar bending schedule and pre-slung to facilitate safe unloading. Supplier should also provide any method statements and their related risk assessment as well as all relevant quality documentation such as quality management plan, grade mill certificates for the supplied re-bar, CARES certificates, CARS certificates and technical data sheets for the couplers, samples for testing (if required) and any other required to demonstrate compliance with the specification and industry standards.The package covers three key activities spanning over the next 2 and half years. These are the construction of the complex Curzon no. 3 post tensioned reinforced concrete deck and its finishes with 6220m3 of concrete and 2384tonnes of reinforcement remaining, the construction of the deck finishing works across the remaining assets of Curzon Approach (Curzon no. 2, Curzon no. 1 and Duddeston Viaduct) with ....tonnes remaining and the fabrication of the precast concrete slabs for Curzon Approach at BBV Kingsbury Yard with ....tonnes remaining.

Location

Country

United Kingdom (UK)

Source

Source

Contracts Finder

URL

More Details

Record type

Tender

Sector

Bridge, Steel, Manufacturing (Industrial), Cement

Article published date

2026-05-14

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender