logo

Beachfront Landscape Maintenance

One of 10,000+ tenders Taiyo tracks in California.

Source: California Purchasing Group

Tender
Closed

Work Schedule a . The Contractor shall perform normal operations between 7 : 00 a . m . and 5 : 00 p . m ., Monday through Friday . Work outside these hours must be coordinated with the Contract Administrator . b . The City retains the right to require that specific sites be maintained on designated days and time

Status
Closed
Sector
Oil and Gas, Energy Storage, Fertilizers, Water Supply and Storage, Cement, Automotive, Power Transmission, Power Generation (CCGT)
Location
California, United States of America
Updated
3 Nov 2026
Source
California Purchasing Group

ConstructChat

Ask ConstructChat about Beachfront Landscape Maintenance

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Beachfront Landscape Maintenance” is a tender record in Taiyo, linked to the Oil and Gas sector. It is issued for works, goods, or services related to California, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Work Schedule a . The Contractor shall perform normal operations between 7 : 00 a . m . and 5 : 00 p . m ., Monday through Friday . Work outside these hours must be coordinated with the Contract Administrator . b . The City retains the right to require that specific sites be maintained on designated days and times . c . The Contractor shall maintain the minimum staffing assigned to this contract five ( 5 ) days a week , Monday through Friday , for an eight ( 8 )- hour workday . Personnel assigned to meet the minimum staffing requirement shall not be used on other City contracts . d . The Contractor shall not leave a work site to complete another site or project without first completing the assigned work for that day . e . The Contractor shall provide the City with a monthly work schedule . f . All scheduled daily , weekly , and monthly tasks must be completed as scheduled . Failure to do so will result in a deduction per task . 2 . 2 Emergency Services The Contractor shall provide the City with the names and telephone numbers of at least two ( 2 ) qualified individuals available and capable of responding to emergency maintenance conditions outside of normal working hours . The Contractor shall respond to emergency calls within one ( 1 ) hour of notification by the City . Emergency services are included as part of this contract . Failure to respond to an emergency call resulting in the dispatching of City personnel will result in a fee of $ 250 per hour , with a two ( 2 ) hour minimum . This fee will be deducted from payments due to the Contractor . 2 . 3 Vandalism City - owned property that is damaged , vandalized , or missing due to unknown causes shall be repaired or replaced by the Contractor at no additional cost to the City . The Contractor shall be responsible for all labor associated with such repairs . The Contractor shall be responsible for material costs up to a maximum of ten thousand dollars ($ 10 , 000 ) per incident , as determined by the City . The City shall be responsible for any costs exceeding this amount . Backflows , cages , and irrigation controllers will be supplied by the City ; however , installation shall be performed by the Contractor as part of this contract . 2 . 4 Safety a . All work performed under this contract shall be conducted in a manner that protects the public and complies with all applicable OSHA and Cal / OSHA rules and regulations . b . The Contractor shall take all necessary precautions to protect the public from injury , loss of life , or damage to property 2 . 5 On - Site Storage The storage of tools , equipment , or materials within the project area , public right - ofway , or easements is prohibited . 2 . 6 Inclement Weather a . During periods of inclement weather that hinder normal operations , the Contractor shall perform storm - related duties as directed by the City . b . The Contractor shall assist in repairing storm - related damage at sites in this contract . c . The Contractor shall dewater ( pump out ) flooded parks and sites as directed by the City . d . The Contractor shall not perform work during inclement weather that may damage groundcover or turf areas . e . The Contractor shall not reduce staffing levels due to inclement weather . Failure to maintain staffing levels will result in a deduction . 2 . 7 Vehicles and Equipment a . All vehicles and equipment shall be uniform in color scheme and appearance and shall be maintained in good condition . b . The Contractor shall display the company name on all vehicles and equipment in lettering large enough to be legible from one hundred ( 100 ) feet . c . All vehicles shall be equipped with operational strobe lights , light bars , and any required traffic control devices . d . Personal vehicles shall not be used for work under this contract . 2 . 8 Uniforms & Personal Protective Equipment The Contractor shall provide employees with uniforms that include company identification , appropriate work boots , and all necessary personal protective equipment ( PPE ). Uniforms , boots , and PPE shall be maintained in good condition at all times . Jeans are not permitted as work pants under this contract . 2 . 9 Underground Excavations a . The Contractor shall be responsible for locating all underground utility lines prior to excavation to ensure the safety of personnel and to protect existing utility infrastructure . b . The Contractor shall contact the Underground Service Alert ( USA ) prior to excavation to identify and mark underground utility lines . c . The Contractor shall comply with all applicable laws and regulations related to underground utility notification and excavation . 2 . 10 Traffic Control a . All traffic control shall be in accordance with the latest editions of the following : Caltrans Manual on Uniform Traffic Control Devices ( MUTCD ), Sign Specifications , Standard Plans , Standard Specifications , and the American Public Works Association Southern California Chapter – Work Area Traffic Control Handbook . b . The Contractor shall provide and maintain all signs , barricades , flashers , and delineators necessary to protect the motoring public within the limits of the work area . All traffic control equipment shall be maintained in like - new condition . c . All Contractor vehicles used in or adjacent to active work areas shall have traffic control lighting , including light bars and strobe lights , activated at all times during operations , including when vehicles are stationary or parked . 2 . 11 Protection of Existing Improvements a . The Contractor shall protect all existing improvements within the project limits that are not designated for removal . If such improvements ( e . g ., curbs , gutters , sidewalks , driveways , fences , walls , irrigation systems , signs , utility installations , pavements , and structures ) are damaged or removed as a result of the Contractor ’ s operations , the Contractor shall repair , replace , or re - establish them at no additional cost to the City . b . Repairs , replacements , or re - establishments shall be equal to the original condition and shall match the existing improvements in finish and dimensions , unless otherwise specified by the City . c . All costs associated with protecting , removing , restoring , repairing , replacing , or re - establishing existing improvements shall be included in the contract price , and not considered additional or extra work . d . If the Contractor fails to correct deficiencies to the City ’ s standards , the City may perform the work or have the work performed by others and deduct the associated cost from payments due to the Contractor . 2 . 12 Inspections & Deductions a . The City and Contractor ’ s representative shall conduct weekly inspections of the areas included in this contract . The results shall be documented using a Landscape Maintenance Punch List . b . Deficiency Notice / Deduction : The Contractor shall correct all deficiencies within the timeframe specified by the City of Huntington Beach Deduction Schedule . If deficiencies are not corrected within the specified timeframe , the City may perform the work or have the work performed by others and deduct the associated cost from payments due to the Contractor . c . Withholding Payment : If work identified in a Deficiency Notice is not completed within the specified timeframe , payment for the deficient work may be withheld . The Contractor shall not be entitled to retroactive payment for work not completed within the required timeframe . d . The Contractor ’ s representative shall maintain regular communication with the City regarding maintenance issues requiring correction . The Contractor shall provide time - stamped photos documenting completion of corrective work . 2 . 13 Hauling a . Any spillage resulting from hauling operations on or across public thoroughfares shall be immediately removed at the Contractor ’ s expense . b . If the spillage involves a hazardous substance , including but not limited to petroleum products or pesticides , the Contractor shall immediately contact emergency services ( 911 ) and take appropriate measures to prevent the substance from entering storm drains . 2 . 14 Sand in Landscape Areas The Contractor shall remove all sand from landscaped areas . 2 . 15 Irrigation a . The Contractor shall be responsible for programming and monitoring all irrigation controllers . b . Irrigation controller programs shall be sufficient to maintain a healthy landscape without excessive water use or runoff . c . The entire irrigation system , including all components from the connection at the backside of the water meter , shall be maintained in operational condition at all times . This shall include , but is not limited to , controllers , backflows , remote control valves , gate valves , booster pumps , sprinkler heads , and all irrigation components . All associated costs shall be included in the contract price . d . All irrigation systems shall be tested and inspected regularly , and a written report shall be submitted monthly or upon request by the City . e . Malfunctioning irrigation systems shall be repaired within twenty - four ( 24 ) hours of notification by the City . f . Battery - operated controllers shall be maintained in continuous working condition by replacing batteries , as necessary , at the Contractor ’ s expense . g . The Contractor shall provide personnel trained in irrigation system maintenance and irrigation controller programming . h . All work shall be performed in accordance with the City of Huntington Beach ’ s Landscape Standard Plans and Specifications ( 700 Series ), available at the City of Huntington Beach Public Works Standard Plans webpage , and the Water Standard Plans . No substitutions shall be permitted . i . Replacement parts and materials shall match original equipment specifications unless otherwise approved by the Contract Administrator . All parts and materials required for irrigation system maintenance and repair shall be included in the contract price . j . The Contractor shall maintain an adequate inventory of commonly used parts necessary for irrigation system repairs . 2 . 16 Fertilizing a . Groundcover and shrub areas shall be fertilized in March using a complete fertilizer ( 16 - 6 - 8 plus trace elements ) at approximately one ( 1 ) pound of nitrogen per 1 , 000 square feet . Areas shall be watered thoroughly the day before fertilizing and immediately after the application . b . Turf areas shall be fertilized as follows : Turf shall receive three ( 3 ) pounds per 1 , 000 square feet of nitrogen per application , applied in March and late October using a complete fertilizer . 2 . 17 Turf a . Turf areas shall be mowed , edged , and string trimmed weekly . Turf shall be mowed before reaching three ( 3 ) inches in height . b . Turf shall be trimmed along the edges of sidewalks , curbs , mow strips , retaining walls , posts , trash enclosures , valve boxes , controllers , light standards , and from the dripline to the trunk of trees . c . Edging along concrete surfaces shall be done using a bladed edger . d . The City may request the Contractor to adjust mowing heights for special events or conditions . e . Turf aerification shall be performed prior to each fertilizer application . The entire turf area shall be aerated using a self - propelled machine that removes cores of soil three - quarters ( 3 / 4 ) inch in diameter by four ( 4 ) to six ( 6 ) inches in length , spaced no more than six ( 6 ) inches apart .

Location

Country

United States of America (USA)

State

California

Source

Source

California Purchasing Group

URL

More Details

Record type

Tender

Sector

Oil and Gas, Energy Storage, Fertilizers, Water Supply and Storage, Cement, Automotive, Power Transmission, Power Generation (CCGT)

Article published date

2026-05-10

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender