Beeline Trail Phase 3
Sector: Road • Location: Connecticut, United States of America
Source: Connecticut Purchasing Group
The scope of work generally consists of the construction of the third phase of the Beeline Trail which includes approximately 5 , 300 linear feet of paved multi - use trail beginning on Black Rock Avenue at the New Britain / Plainville town line and continuing along the Route 72 ROW . The trail will cros
- Status
- Closed
- Sector
- Road, Cement
- Location
- Connecticut, United States of America
- Updated
- 3 Nov 2026
- Source
- Connecticut Purchasing Group
ConstructChat
Ask ConstructChat about Beeline Trail Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The scope of work generally consists of the construction of the third phase of the Beeline Trail which includes approximately 5 , 300 linear feet of paved multi - use trail beginning on Black Rock Avenue at the New Britain / Plainville town line and continuing along the Route 72 ROW . The trail will cross both Wooster Street and Hartford Square . The trail will then continue along the Route 72 ROW turning north across from New Hampshire Drive passing west of Everett Street and ending at the intersection of Corbin Avenue and the Route 72 Off Ramp . The proposed project is intended to provide a connection between the Beeline Trail Phase 2 project at the easterly limits and the proposed multi - use trail project in Plainville at the westerly limits . The construction of this project includes a paved multi - use trail , limited drainage improvements , traffic signal modifications , fencing , curbing , concrete sidewalks , minor landscaping , and restoration of disturbed areas . |
Location
Country | United States of America (USA) |
State | Connecticut |
Source
Source | Connecticut Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Cement |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
