Benton Boulevard Intersection Signalization
Sector: Road • Location: Georgia, United States of America
Source: Georgia Purchasing Group
The work shall consist of the demolition and removal from the site four ( 4 ) existing traffic signs and approximately 513 SF of existing sidewalk , 71 LF of existing curb , 45 LF of existing curb and gutter , 178 SF of existing traffic island , 14 SF of existing tactile paving and 161 LF of existing
- Status
- Closed
- Sector
- Road, Car parking, Cement, Automotive
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about Benton Boulevard Intersection Signalization
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The work shall consist of the demolition and removal from the site four ( 4 ) existing traffic signs and approximately 513 SF of existing sidewalk , 71 LF of existing curb , 45 LF of existing curb and gutter , 178 SF of existing traffic island , 14 SF of existing tactile paving and 161 LF of existing pavement stripping . The contractor shall also furnish and install five ( 5 ) concrete ADA ramps , 14 LF of 18 ” normal curb and gutter , 37 SY of heavy duty asphalt pavement , 1 , 783 LF of 8 ” thermoplastic crosswalk striping , 243 LF of 4 ” thermoplastic skip striping , 114 LF of 4 ” thermoplastic solid striping , 142 LF of 24 ” thermoplastic stop bar , three ( 3 ) GDOT Type 3 thermoplastic turn arrows , street signage , 1 , 125 LF of 2 ” conduit , 244 LF of 6 ” directional bore and the traffic signal and control boxes complete and ready to operate . All pavement markings shall be thermoplastic . The project area is located at the intersection of Benton Boulevard and West Mulberry Boulevard / Towne Center Drive . All work will occur within the designated road right of way and construction easements . The Contractor shall be responsible for providing traffic control at the site and for the offsite disposal of all items / debris to be demolished or removed . |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Car parking, Cement, Automotive |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
