BID - MCC - Snow Plowing & Removal
Sector: Road • Location: Minnesota, United States of America
Source: Minnesota Purchasing Group
An aerial map of the MCC area is attached in the Events Comments and Attachments section . The areas shaded in yellow are the areas that are required to be plowed with the snow removed . MCC Marshalling Yard and Parking Ramp Snow Plowing • Whenever accumulating snowfall reaches 2 inches or greater in
- Status
- Closed
- Sector
- Road, Car parking, Automotive
- Location
- Minnesota, United States of America
- Updated
- 3 Nov 2026
- Source
- Minnesota Purchasing Group
ConstructChat
Ask ConstructChat about BID - MCC - Snow Plowing & Removal
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | An aerial map of the MCC area is attached in the Events Comments and Attachments section . The areas shaded in yellow are the areas that are required to be plowed with the snow removed . MCC Marshalling Yard and Parking Ramp Snow Plowing • Whenever accumulating snowfall reaches 2 inches or greater in Downtown Minneapolis : o Work to be completed between the hours of 10 : 00 p . m . and 6 : 00 a . m . CT . o Contact MCC to authorize other hours or additional work below 2 inches of accumulation . - or - • Whenever the awarded Contractor is called by the MCC : o The awarded Contractor must be on site removing snow , no later than 90 minutes ( 1 . 5 hours ) from time of notification . The following areas must be plowed , sanded , salted and all snow removed away from the site on the same day that plowing was done Exterior Loading docks and Marshalling Yard ( Area behind the MCC ). o Ramp going down to underground loading dock ( Dock A ) o Main parking / marshalling areas behind Halls B , C , D , and E including dock wells . o Lot on East side of fire station # 6 ( Chiller Lot ) o Note : All other areas adjacent to Fire Station # 6 including the lot on the west side of the station are not included in this bid . • MCC Visitors Lot / Wesley Church parking lot ( Located east of 1st Ave ). o Entrance & Exit o Parking space • MCC Parking Ramp ( Located off 3rd Avenue east of MCC ). o Plow and clear all affected areas including 3rd avenue entrance and any exposed driving surfaces . o Remove snow inside the CLC parking ramp ( levels above ground ) that blows into our covered areas during snow events . • 12th Street loading area and parking area ( Located between 2nd Avenue and 3rd Avenue ). o Plow the 12th Street load - in / parking area and haul away the snow from this area . • Curb lane snow removal ( MCC side around the facility ). o This work will be done on an as needed basis . Service & Maintenance Records The awarded Contractor must : • Maintain complete and detailed service and maintenance records . • Such records must be submitted at the end of each calendar month . • Provide work orders that are legible and contain sufficient information about the work performed . • On request , Contractor shall provide documentation that all hauled snow is disposed of properly . |
Location
Country | United States of America (USA) |
State | Minnesota |
Source
Source | Minnesota Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Car parking, Automotive |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
