logo

BID - MRDCVJ - Biological Vessel Repair 54 - 81525

One of 10,000+ tenders Taiyo tracks in Alabama.

Source: Alabama Purchasing Group

Tender
Closed

All correspondence must be made through the Vendor Portal . 1 Required Item TEST / REPLACE SEACOCKS / HOSES TEST / REPLACE SEACOCKS / HOSES WORK REQUESTED : * REPLACE SEA COCK VALVES WITH BRASS MARINE GRADE BALL VALVES AND RESEAL HULL SURFACES USING MARINE GRADE SPEC SEALING . * REPLACE NECESSARY RAW WATER HOSES AND P

Status
Closed
Sector
Chemical (Industrial), Water Supply and Storage, Energy Storage, Metal, Steel, Manufacturing (Industrial), Rail, Seaport, Commercial
Location
Alabama, United States of America
Updated
3 Nov 2026
Source
Alabama Purchasing Group

ConstructChat

Ask ConstructChat about BID - MRDCVJ - Biological Vessel Repair 54 - 81525

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “BID - MRDCVJ - Biological Vessel Repair 54 - 81525” is a tender record in Taiyo, linked to the Chemical (Industrial) sector. It is issued for works, goods, or services related to Alabama, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

All correspondence must be made through the Vendor Portal . 1 Required Item TEST / REPLACE SEACOCKS / HOSES TEST / REPLACE SEACOCKS / HOSES WORK REQUESTED : * REPLACE SEA COCK VALVES WITH BRASS MARINE GRADE BALL VALVES AND RESEAL HULL SURFACES USING MARINE GRADE SPEC SEALING . * REPLACE NECESSARY RAW WATER HOSES AND PLUMBING WITH THE CORRECT SPECIFICATION GRADE HOSE / PIPE . ** Price is to include all labor , parts , supplies , materials , fees , and anything needed to complete job 95924 - Boats and Motors Maintenance and Repair 1 . 00 Job 2 Required Item TRIM TAB REPAIR TRIM TAB REPAIR WORK REQUESTED : * REPLACE LENCO TRIM TAB SYSTEM WITH NEW * INSURE WORKING OPERATION ** Price is to include all labor , parts , supplies , materials , fees , and anything needed to complete job 95924 - Boats and Motors Maintenance and Repair 1 . 00 Job 3 Required Item REPLACE DOOR CATCH REPLACE DOOR CATCH WORK REQUESTED : * REMOVE CURRENT AFT DOOR CATCH * CLEAN AND PREPARE SURFACE WITH NON - FLAMMABLE AND NON - TOXIC CHEMICALS * REPLACE AFT DOOR CATCH ON CABIN DOOR WITH A NON - CORROSIVE STAINLESS - STEEL MATERIAL AND COMPARABLE DOOR CATCH STRENGTH . ORIGINAL MANUFACTURER IS MARINE TOWN . * USE CORRECT MARINE GRADE ADHESIVES AND FASTENERS ** Price is to include all labor , parts , supplies , materials , fees , and anything needed to complete job 95924 - Boats and Motors Maintenance and Repair 1 . 00 Job 4 Required Item REPLACE BOX HINGES REPLACE BOX HINGES WORK REQUESTED : * TEST AND REMOVE CURRENT BATTERY BOX HINGES * PREPARE SURFACE BY CLEANING WITH A NON - FLAMMABLE AND NON - TOXIC CHEMICAL * REPLACE HINGES ON BATTERY BOXES WITH A NON - CORROSIVE STAINLESS - STEEL MATERIAL * HINGES , FASTENERS , AND ADHESIVES MUST BE SUITABLE TO THE CORROSIVE ELEMENTS AND STRUCTURALLY STRONG ENOUGH ** Price is to include all labor , parts , supplies , materials , fees , and anything needed to complete job 95924 - Boats and Motors Maintenance and Repair 1 . 00 Job 5 Required Item HELM CHAIR SUPPLY & INSTALL HELM CHAIR SUPPLY & INSTALL WORK REQUESTED : * SUPPLY AND INSTALL NEW HELM CHAIRS AND BASES IN CABIN * SPECS AS FOLLOWS HEIGHT ADJUSTMENT H20 FOX FLOAT SHOCK FOR THE BASE BLACK IN COLOR WITH HEAVY DUTY FABRIC MATERIAL CHOSEN MANUFACTURE SHOCKWAVE ** Price is to include all labor , parts , supplies , materials , fees , and anything needed to complete job 95924 - Boats and Motors Maintenance and Repair 1 . 00 Job 6 Required Item DOCKING LIGHTS / SPREADER LIGHTS DOCKING LIGHTS / SPREADER LIGHTS WORK REQUESTED : * REPLACE DOCKING LIGHTS * ROUND DOCKING LIGHTS IN HULL * DOCKING LIGHTS ( FRONT X1 , PORT / STARBOARD X1 PER SIDE AND REAR FACING X2 ). * INSPECT / REPLACE RED AND GREEN NAVIGATION LIGHT . * INSPECT / REPLACE STERN LIGHT ON TOP * ALL LIGHTS MUST MEET USCG AND ABYC STANDARDS AND REGULATIONS * NAVIGATION LIGHTS MUST BE VISIBLE FROM 2 - 3 NM ** Price is to include all labor , parts , supplies , materials , fees , and anything needed to complete job 95924 - Boats and Motors Maintenance and Repair 1 . 00 Job 7 Required Item FIT & INSTALL RUB RAIL FIT & INSTALL RUB RAIL WORK PERFORMED : * REMOVE OLD RUBBER BUMP RAIL * FABRICATE NEW RAIL FOR RUBBER TO BE FASTENED TO * SUPPLY AND INSTALL NEW RUBBER BUMP RAIL FOR VESSEL * THE NEW RUB RAIL MUST BE THE SAME DIMENSION AS THE ORIGINAL RUB RAIL WITH 65MM EQUIVALENT RUBBER MATERIAL COMPOSITION ** Price is to include all labor , parts , supplies , materials , fees , and anything needed to complete job 95924 - Boats and Motors Maintenance and Repair 1 . 00 Job 8 Required Item INSPECT / REPLACE FUEL LINES INSPECT / REPLACE FUEL LINES WORK REQUESTED : CHECK FUEL LINES * REPLACE FUEL LINES COMING FROM TANK TO ENGINE * REPLACE FILL FUEL LINE FROM FILL NECK ON GUNNEL TO FUEL TANK * REPLACE ALL HOSE CLAMPS WITH NEW CLAMPS * REPLACE VENT LINE FROM FILL NECK TO TANK SIDE * PUMP FUEL TANK AND CLEAN * CHECK AND INSPECT TANK INTEGRITY ( ALUMINUM TANK ) * ALL DISCHARGE PORTS ON PORT AND STBD SIDES FROM TANK PICK UP TO BE REPLACED BY EQUIVALENT PLUMBING COMPOSITION . * ALL LINES MUST BE REPLACED WITH MARINE GRADE AND COMPATIBLE WITH DIESEL FUEL FLOWING INTERNALLY ** Price is to include all labor , parts , supplies , materials , fees , and anything needed to complete job 95924 - Boats and Motors Maintenance and Repair 1 . 00 Job 9 Required Item FUEL GAUGE READING FUEL GAUGE READING WORK REQUESTED : * REPLACE FUEL GAUGE SYSTEM TO INCLUDE GAUGE , SENDER , AND WIRING * REPLACEMENT COMPONENTS MUST BE THE SAME OR EQUIVALENT TO THE ORIGINAL . GAUGE IS A 12 VOLT , 2INCH DISPLAY , WITH AN ANALOG READING AND BACK LIGHTING . FUEL SENDING IS A FLOAT CONTROL DESIGN ** Price is to include all labor , parts , supplies , materials , fees , and anything needed to complete job 95924 - Boats and Motors Maintenance and Repair 1 . 00 Job 10 Required Item REPLACE SALTWATER WASHDOWN REPLACE SALTWATER WASHDOWN WORK REQUESTED : * REPLACE SALTWATER WASHDOWN PUMP * REMOVE CURRENT WASHDOWN PUMP AND WIRING * REMOVE HOSES FROM WASHDOWN PUMP * REMOVE OLD DISCHARGE PORT * INSTALL NEW DISCHARGE PORT * INSTALL NEW PUMP WITH NEW CLAMPS AND WIRE * REPLACE HOSES FROM THE WASHDOWN PUMP * ALL PARTS MUST MEET 3 - 7 . 5 GPM WITH 45 - 80 PSI ON A 12V SYSTEM * PROVE OPERATION ** Price is to include all labor , parts , supplies , materials , fees , and anything needed to complete job 95924 - Boats and Motors Maintenance and Repair 1 . 00 Job 11 Required Item ELECTRICAL REPLACEMENT ELECTRICAL REPLACEMENT WORK REQUESTED : * REMOVE AND REWIRE ALL DC WIRING OF VESSEL * DISCARD ALL WIRING FROM HULL THAT IS NOT NECESSARY PROPERLY INSULATED TINNED COPPER MARINE GRADE WIRE WITH ADHESIVE HEAT SHRINK CONNECTORS * DIELECTRIC GREASE APPLIED TO ALL CONNECTORS UPON INSTALLATION * CONFIRM OPERATIONS ** Price is to include all labor , parts , supplies , materials , fees , and anything needed to complete job 95924 - Boats and Motors Maintenance and Repair 1 . 00 Job 12 Required Item DC FAN REPLACEMENT DC FAN REPLACEMENT WORK PERFORMED : * REMOVE AND REPLACE DC FANS IN HELM AREA * FANS MUST BE EQUIVALENT TO THE ORIGINAL WITH NON - CORROSIVE PROPERTIES . ORIGINAL MODEL 12 VOLT # 900 6 INCH FAN 06450 - 7198 ** Price is to include all labor , parts , supplies , materials , fees , and anything needed to complete job 95924 - Boats and Motors Maintenance and Repair 1 . 00 Job 13 Required Item ELECTRICAL COMPONENT ALLOWANCE ELECTRICAL COMPONENT ALLOWANCE WORK PERFORMED : * ALLOWANCE FOR MISC CORRODED COMPONENT - ELECTRICAL ** Price is to include all labor , parts , supplies , materials , fees , and anything needed to complete job 95924 - Boats and Motors Maintenance and Repair 1 . 00 Job 14 Required Item REPAIR BATTERY CHARGER PORT REPAIR BATTERY CHARGER PORT WORK PERFORMED : * SECURE CORD AND FITTING FOR BATTERY CHARGER WHERE THEY ARE . * MAKE SAFE AND SECURE * REMOVE CURRENT EXTENSION PORT PLUG * INSTALL NEW EXTENSION PORT THAT IS HARD WIRED * VERIFY THAT CHARGER IS CHARGING BATTERIES CONNECT CHARGER INLET BLK ( 1 ) TIEDOWNS , FASTENER ( 1 ) Freight Shop Supplies and Environmental Fees Labor 95924 - Boats and Motors Maintenance and Repair 1 . 00 Job 15 Required Item CRANK AND HOUSE BATTERIES CRANK AND HOUSE BATTERIES WORK PERFORMED : * CRANKING AND HOUSE BATTERIES REPLACEMENT WITH NEW AC DELCO BATTERIES * REPLACE BOTH PORT AND STARBOARD CABLES FROM BATTERY SWITCH TO BATTERY WITH 1 / 0 WIRE . * TINNED STRANDED COPPER ( Type III ), ULTRA FLEXIBLE PVC INSULATION RATED FOR ( 221 F ) AND MARINE CONDITIONS ADHERE TO STANDARDS ABYC E - 11 , and USCG * REPLACE BATTERY SWITCHES WITH PERKO 250 AMP BATTERY SELECTOR SWITCH WITH ALTERNATOR FIELD DISCONNECT . PROVE OERATION . ** Price is to include all labor , parts , supplies , materials , fees , and anything needed to complete job 95924 - Boats and Motors Maintenance and Repair 1 . 00

Location

Country

United States of America (USA)

State

Alabama

Source

Source

Alabama Purchasing Group

URL

More Details

Record type

Tender

Sector

Chemical (Industrial), Water Supply and Storage, Energy Storage, Metal, Steel, Manufacturing (Industrial), Rail, Seaport, Commercial

Article published date

2026-03-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender