Bird Control Netting Installation
Sector: Waste Processing and Treatment • Location: Dyess AFB, Texas, United States of America
Source: SAM.gov
QUOTE SUBMISSION INFORMATION: E-mail is the required method for offer submission. The Contracting Specialist or Officer will send a confirmation email once your quote is received. If you do not receive a confirmation email, the Government did not receive your quote. Your offer shall include but is not limited to the following: Complete (must be signed) Page 2 of RFQ (or contractor equivalent*) . T
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Government, Commercial, Aerospace & Defense, Residential
- Location
- Dyess AFB, Texas, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Bird Control Netting Installation
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | QUOTE SUBMISSION INFORMATION: E-mail is the required method for offer submission. The Contracting Specialist or Officer will send a confirmation email once your quote is received. If you do not receive a confirmation email, the Government did not receive your quote. Your offer shall include but is not limited to the following: Complete (must be signed) Page 2 of RFQ (or contractor equivalent*) . Technical Plan IAW SOW Technical Specifications of Quoted Product IAW SOW/Salient Characteristics * The offeror is not required to use Page 2 of this RFQ; however, if you choose not to use it, all of the information on Page 2 of this RFQ must be included in your offer. Site Visit: A site visit will be scheduled for this requirement. An amendment will be posted with the details. Deadline for Questions pertaining to this solicitation: Questions shall be sent to the email addresses: reijo.rantala@us.af.mil and taylor.norris@us.af.mil, NLT 10 Jul 2026, 12:00 p.m. (CDT). Deadline for receipt of offers: NLT 24 July 2026, 2:00 p.m. (CDT). All quotes shall be emailed to reijo.rantala@us.af.mil and taylor.norris@us.af.mil, Please see attached RFQ and SOW for more detailed information. ***Amendment 0001 - The purpose of this amendement is to provide a date for the pre-proposal site visit. It will be held on 13 Jul 26, at 0900 AM (CDT). Please email taylor.norris@us.af.mil for further information if you are planning on attending. Additionally, the close date for this solicitation has been extended to 24 Jul 26. Questions and answers will be posted following the site visit, as well as any pictures taken. Please see attached RFQ amendment - all changes are higlighted in Red. *** ***Amendment 0002 - The Purpose of this amendment is to provide the questions and answers from the site visit and other contractors. Pictures of the site are included in the questions and answers document. All answers and further changes to the solicitation are highlighted in red.*** |
Original sector | Administrative and Support and Waste Management and Remediation Services |
Location
Country | United States of America (USA) |
State | Texas |
City | Dyess AFB |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Government, Commercial, Aerospace & Defense, Residential |
Article published date | 2026-07-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
