logo

Birdie Drive Stormwater Improvement Project ( Phase 1 and 2 )

Closed · Georgia · Last reported Mar 2026

Source: Georgia Purchasing Group

Tender
Closed

The Douglasville – Douglas County Water and Sewer Authority ( the “ Authority ”) is soliciting competitive sealed bids from qualified contractors for the performance of the Birdie Drive Stormwater Improvement Project ( Phase 1 and 2 ) ( the “ Project ”), as more fully described in the Invitation for Bids . The scope o

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Metal, Cement
Location
Georgia, United States of America
Updated
3 Nov 2026
Source
Georgia Purchasing Group

ConstructChat

Ask ConstructChat about Birdie Drive Stormwater Improvement Project ( Phase 1 and 2 )

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Birdie Drive Stormwater Improvement Project ( Phase 1 and 2 )” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Georgia, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Douglasville – Douglas County Water and Sewer Authority ( the “ Authority ”) is soliciting competitive sealed bids from qualified contractors for the performance of the Birdie Drive Stormwater Improvement Project ( Phase 1 and 2 ) ( the “ Project ”), as more fully described in the Invitation for Bids . The scope of work includes the provision by the bidder or contractor of all labor , materials , equipment , tools , transportation , and supplies necessary to complete the work . The Project will be “ turnkey ” and require minimal involvement of Authority personnel . The Phase 1 work to be performed shall include installing an engineered Cured - In - Place Pipe ( CIPP ) liner in an existing 15 - inch corrugated metal pipe ( CMP ) storm system with a total length of approximately 197 linear feet . Phase 2 includes installing ( spin - casting ) an engineered centrifugally cast concrete pipe ( CCCP ) liner in approximately 454 linear feet of existing 36 - inch corrugated metal pipe ( CMP ) located near the property at 3995 Birdie Drive . The plans for the Birdie Drive Stormwater Improvement Project ( Phase 1 and 2 ), have been prepared by the Authority , Dane Hanson , P . E ., dated March 2 , 2026 . Special Conditions and Appendices contain more detailed information on the Project scope .

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Waste Processing and Treatment, Metal, Cement

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender