Bloomingdale Public Schools Bond Series II Renovations Earthwork
Closed · MITN · Last reported Dec 2025
Source: MITN Purchasing Group
1 . Complete site related and demolition work as shown on the drawings and as specified in the following sections : 01 5723 Temporary Stormwater Pollution Controls 02 4119 Selective Demolition 12 2413 Site Furnishings 31 0000 Earthwork 32 1216 Asphalt Paving 32 9219 Turf and Grasses 33 4200 Stormwater Con
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Commercial, Cement
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Bloomingdale Public Schools Bond Series II Renovations Earthwork
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . Complete site related and demolition work as shown on the drawings and as specified in the following sections : 01 5723 Temporary Stormwater Pollution Controls 02 4119 Selective Demolition 12 2413 Site Furnishings 31 0000 Earthwork 32 1216 Asphalt Paving 32 9219 Turf and Grasses 33 4200 Stormwater Conveyance 2 . All necessary surveying and staking for this contractor ’ s work . The Construction Manager will supply building control points and establish a benchmark . 3 . Responsible for final connection of trench drain to existing storm water . 4 . Applicable fees , permits , inspections , etc . as required for the completion of the work in this bid category . 5 . Sleeves indicated on the drawings . 6 . Slab sand pavement subbase construction per details . Gravel subbase to be graded and compacted to +/- 0 . 05 foot . Final grading and proof rolling are the responsibility of asphalt paving or concrete contractor . This contractor is responsible for compaction and / or correction of any areas that do not pass tests . 7 . Responsible for keeping public roads clean of construction traffic dirt and debris . 8 . Excavation , bedding materials , piping , structures , backfill , compaction , etc . as required for all underground utility construction , all to within 5 feet of the building unless noted otherwise . 9 . Temporary tree protection measures . 10 . Temporary inlet protection measures . 11 . Strip , stockpile and respread topsoil to machine grade +/- 0 . 10 foot . 12 . Site related demolition , including but not limited to , pavements , site walls , utility structures , curb and gutter , trees , utility structures piping , etc . 13 . Soil erosion permit and erosion control . 14 . Maintain and control grades to facilitate the run - off of site surface water . 15 . Supply and maintain barricading as required for the work of this contractor . 16 . Excavation , over excavation and controlled fill for building foundations installed by the concrete contractor , including proper disposal , at an off - site location , of unsuitable soils . 17 . Implement and maintain all BMP ' s deemed necessary by either the Certified Storm Water Operator or the Agency responsible for jurisdiction of Protection Act 451 . 18 . Responsible to follow the most stringent requirements between the architectural specifications and those listed in the recommendations of the geotechnical report . 19 . Include all landscaping topsoil , overseeding , touch ups of work and access work of existing grass areas . 20 . Finish grade all topsoil , seeded and landscaped areas , including removal of stones , dirt clumps , sticks and weeds . 21 . Maintenance of plantings for one ( 1 ) year period after substantial completion 22 . Coordination with project superintendent for protection of all underground private utilities . No additional costs as a result of a lack of coordination will be accepted . 23 . Subcontractor must coordinate its work with the work of other subcontractors at the site to eliminate conflicts . No additional costs as a result of a lack of coordination will be accepted . Exclude : 1 . Testing will be provided for and paid for by the Owner . 2 . Excavation and backfill mechanical and electrical trades . 3 . Handrails as noted in spec section 12 9300 handrails . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Commercial, Cement |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender