Bloomingdale Public Schools Bond Series II Renovations Flooring
One of 3,321 tenders Taiyo tracks in MITN.
Source: MITN Purchasing Group
1 . Complete flooring as shown on the drawings and as specified in the following sections : 02 4119 Selective Demolition 09 3000 Tiling 09 6513 Resilient Base and Accessories 09 6723 Resinous Flooring 09 6813 Tile Carpet 2 . Demo of flooring and wall tile . 3 . Preparation of floor and wall surfaces such
- Status
- Closed
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Bloomingdale Public Schools Bond Series II Renovations Flooring
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . Complete flooring as shown on the drawings and as specified in the following sections : 02 4119 Selective Demolition 09 3000 Tiling 09 6513 Resilient Base and Accessories 09 6723 Resinous Flooring 09 6813 Tile Carpet 2 . Demo of flooring and wall tile . 3 . Preparation of floor and wall surfaces such as grinding , patching , latexing , latence , scum and paint removal , etc . 4 . Final cleaning of carpet and tile surfaces . 5 . Required reducer strips and base . 6 . Caulking of control joints in tile surfaces . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
