Bloomingdale Public Schools Bond Series II Renovations General Trades
The scope, dates and status of this tender. A free account opens every field.
Source: MITN Purchasing Group
1 . Complete general work as shown on the drawings and as specified in the following sections : 03 6000 Post Installed Anchors 06 1053 Rough Carpentry 06 1600 Sheathing 06 4116 Plastic Laminate Faced Architectural Cabinets 07 2100 Thermal Insulation 07 9200 Joint Sealants 08 1113 Hollow Metal Doors and
- Status
- Closed
- Sector
- Geothermal, Metal
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Bloomingdale Public Schools Bond Series II Renovations General Trades
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . Complete general work as shown on the drawings and as specified in the following sections : 03 6000 Post Installed Anchors 06 1053 Rough Carpentry 06 1600 Sheathing 06 4116 Plastic Laminate Faced Architectural Cabinets 07 2100 Thermal Insulation 07 9200 Joint Sealants 08 1113 Hollow Metal Doors and Frames 08 4116 Wood Doors 08 7100 Door Hardware 10 2113 . 19 Plastic Toilet Compartments 10 2800 Toilet , Bath and Laundry Accessories 10 5126 Plastic Lockers 12 2413 Roller Window Shades 2 . Schedule , take delivery , inventory , store and install all items noted as “ Install Only ” above . Provide a list of material received each day to the Construction Manager ’ s Superintendent . All items not so noted are to be furnished and installed . 3 . Take field measurements , onsite surveys and inspections required for the ordering and / or installations of items provided under their scope of work . 4 . Furnish and erect all blocking shown on drawings or as specified in Miscellaneous Carpentry . Include all blocking not shown but incidental to your scope of work . 5 . Roof sheathings / blocking as shown . Prior to installation schedule a meeting with the roofing contractor to coordinate requirements . Notify the Construction Manager ’ s superintendent of the meeting so that he / she can be in attendance , furnish , for others to install , anchor bolts required for blocking installation . 6 . Installation of electric strikes . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Geothermal, Metal |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Geothermal tenders in United States of America
- Biosolids Digester Facilities Project Request / Notice for P...
- Oceanside Water Pollution Control Plant Digester Gas Utiliza...
- MultiSensor HD Thermal Imaging Camera and Helicopter Installation
- ZEBRA ZD421 DIRECT THERMAL DESKTOP PRINTER
- Southeast Treatment Plant (SEP) Biogas Utilization Project
- Induction Mast Standpipe Thermal Spray Repair Services
- Induction Mast Standpipe Thermal Spray Repair Services
- U.S. Department Of Transportation Small Business Innovation Research Fiscal Year 2026 Phase I Solicitation
