Bloomingdale Public Schools Bond Series II Renovations Lath , Plaster , Drywall , Acoustical ( LPDA )
The scope, dates and status of this tender. A free account opens every field.
Source: MITN Purchasing Group
1 . Complete finish and other work as shown on the drawings and as specified in the following sections : 07 2100 Thermal Insulation 07 2419 Water Drainage Exterior Insulation and Finish System ( EFIS ) 07 8443 Joint Fire Stopping 07 9200 Joint Sealants 09 2116 . 23 Gypsum Board Shaft Wall Assemblies 09 22
- Status
- Closed
- Sector
- Water Supply and Storage, Geothermal, Metal, Commercial, Cement
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Bloomingdale Public Schools Bond Series II Renovations Lath , Plaster , Drywall , Acoustical ( LPDA )
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . Complete finish and other work as shown on the drawings and as specified in the following sections : 07 2100 Thermal Insulation 07 2419 Water Drainage Exterior Insulation and Finish System ( EFIS ) 07 8443 Joint Fire Stopping 07 9200 Joint Sealants 09 2116 . 23 Gypsum Board Shaft Wall Assemblies 09 2216 Non - Structural Metal Framing 09 2900 Gypsum Board 09 5113 Acoustical Panel Ceilings 2 . Salvage , store and reinstall ceiling tiles as noted on the drawings . 3 . Fire safeing , fire resistant caulking , sound attenuation blankets and acoustical sealants being an integral part of the wall system , where shown . 4 . All rigid insulation not in composite masonry walls , at foundation walls or part of roofing systems . 5 . See General Comment re : Access Doors 6 . All sound and batt insulation , except that installed in curtainwall or storefront frame . 7 . Sound sealants . 8 . Framing , insulation , sheathing , etc . at exterior walls . 9 . Subcontractor must coordinate its work with the work of other subcontractors at the site to eliminate conflicts . No additional costs as a result of a lack of coordination will be accepted . 10 . Firestopping as indicated on all building drawings including but not limited to ref : note 7 on A01A at MSHS & note 5 & 2 on A101A at BL EL 11 . Responsible for demo of plywood siding and replacement of efis at Bloomingdale Elementary . 12 . Responsible for note 10 A101 at Bloomingdale Elementary . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Geothermal, Metal, Commercial, Cement |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
