logo

Bloomingdale Public Schools Bond Series II Renovations Roofing

The scope, dates and status of this tender. A free account opens every field.

Source: MITN Purchasing Group

Tender
Closed

1 . Complete roofing and related work as shown on the drawings and as specified in the following sections : 02 4119 Selective Demolition 07 0150 . 19 Preparation for Reroofing 07 2220 Roof Deck and Insulation 07 2500 Weather Barriers 07 4293 Soffit Panels 07 5200 Thermoplastic Hybrid Roof System 07 6200

Status
Closed
Sector
Metal
Location
MITN, United States of America
Updated
3 Nov 2026
Source
MITN Purchasing Group

ConstructChat

Ask ConstructChat about Bloomingdale Public Schools Bond Series II Renovations Roofing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Bloomingdale Public Schools Bond Series II Renovations Roofing” is a tender record in Taiyo, linked to the Metal sector. It is issued for works, goods, or services related to MITN, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

1 . Complete roofing and related work as shown on the drawings and as specified in the following sections : 02 4119 Selective Demolition 07 0150 . 19 Preparation for Reroofing 07 2220 Roof Deck and Insulation 07 2500 Weather Barriers 07 4293 Soffit Panels 07 5200 Thermoplastic Hybrid Roof System 07 6200 Sheet Metal Flashing and Trim 07 7100 Roof Specialties 07 7200 Roof Accessories 07 9200 Joint Sealants 2 . Wood blocking needed solely for the installation of the roofing system and / or metal panels and not shown on the drawings . 4 . Applicable fees , permits , inspections , etc . as required for the completion of the work in this bid category . 5 . Flash / seal penetrations through roofing membranes , both existing and new . Present warranties are to be protected and maintained . 6 . Responsible for soffit removal and installation shown on 3 / A101 and associated with alternate PE – 3 . 7 . After reinstallation of roof drain rings verify plumbing connection below 8 . Demolition related to this scope of work including but not limited to gravel stops , edge metal , drain strainers , metal panels , etc . 9 . Subcontractor must coordinate its work with the work of other subcontractors at the site to eliminate conflicts . No additional costs as a result of a lack of coordination will be accepted .

Location

Country

United States of America (USA)

State

MITN

Source

Source

MITN Purchasing Group

URL

More Details

Record type

Tender

Sector

Metal

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender