Boat Launch Dock Refurbishment
Sector: Metal • Location: MITN, United States of America
Source: MITN Purchasing Group
For each skid dock , Contractor shall : 2 . 2 . 1 Remove the skid dock from its site as a whole or in parts . 2 . 2 . 2 After taking careful note of each skid dock ’ s dimensions and construction , dismantle and properly dispose of all wooden skid dock parts leaving just the metal frame components . 2 . 2 .
- Status
- Closed
- Sector
- Metal, Steel, Residential
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Boat Launch Dock Refurbishment
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | For each skid dock , Contractor shall : 2 . 2 . 1 Remove the skid dock from its site as a whole or in parts . 2 . 2 . 2 After taking careful note of each skid dock ’ s dimensions and construction , dismantle and properly dispose of all wooden skid dock parts leaving just the metal frame components . 2 . 2 . 3 Clean the steel frame components with appropriate tools and methods to remove all adhered scum , scale , grease , rust , and any other loose foreign materials from the metal to render the entire metal surface re - paintable with Rust Bullet Paint . 2 . 2 . 4 Carefully inspect the frame components for cracks or other damage and make repair welds or otherwise repair as necessary . 2 . 2 . 5 Once the structural integrity of the frame components is restored , prepare the metal surface for painting and paint the frame components with two coats of black Rust Bullet Paint according to manufacturer ’ s specifications . 2 . 2 . 6 Rebuild the skid docks to match the original construction using new Pressure Treated Critical Structure wood and new marine - grade type 316 or 304 stainless steel hardware with : 2 . 2 . 6 . 1 2x8 Deck Boards 2 . 2 . 6 . 2 4x4 Horizontal Timbers 2 . 2 . 6 . 3 6x6 Vertical Post Timbers 2 . 2 . 7 Return each repaired and refurbished skid dock to its original site . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Metal, Steel, Residential |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Metal tenders in United States of America
- Token Creek Roof Replacements
- HVAC Ice Machine Servicing and Sheet Metal Fabrication
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Various Locations Sewer Replacement No. 9 [BID TABULATION]
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Electrical (C-10 License), San Francisco, San Mateo, Santa C...
