BOILERS & HW PUMPS RFP
Closed · MITN · Last reported Dec 2025
Source: MITN Purchasing Group
o Replacing existing boiler ( s ) and hot water pump ( s ) by providing and installing new sealedcombustion high efficiency boiler ( s ) and hot water pump ( s ) necessary to improve heating system efficiency within the buildings identified in Exhibit B . Existing Equipment Schedule - Boilers and Hot Water Pumps and a
- Status
- Closed
- Sector
- Water Supply and Storage
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about BOILERS & HW PUMPS RFP
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | o Replacing existing boiler ( s ) and hot water pump ( s ) by providing and installing new sealedcombustion high efficiency boiler ( s ) and hot water pump ( s ) necessary to improve heating system efficiency within the buildings identified in Exhibit B . Existing Equipment Schedule - Boilers and Hot Water Pumps and accompanying Basis of Design ( BoD ) as illustrated in : Exhibit C . – Basis of Design ( BoD ) Equipment Schedule – Boilers and Hot Water Pumps o In the replacement of equipment , Subcontractor shall ensure that new equipment installed meets the existing performance characteristics illustrated in Exhibit B unless otherwise specified : Input capacities Flow rate ( GPM ) Pump head ( Ft ) Electrical characteristics o Subcontractor shall perform the following pre - installation activities to verify existing system characteristics : Testing , adjusting , balancing ( TAB ) with accompanying report to validate hot water pump ( s ) design characteristics / performance ( e . g . pump head / pressure , GPM , Motor RPM , Motor Voltage / Amps / Phasing ) and validate that all nameplate information on existing equipment accurately matches the information provided in Exhibit B prior to submittals and / or ordering equipment . In the following locations where Ethylene glycol is currently used in the heating system testing of concentration and quality of Ethylene glycol in the heating system with accompanying report . Ethylene glycol used directly in entire heating system : Lottie Schmidt Elementary School ( Qty 2 Boilers ) Lighthouse Elementary School ( Qty 2 ( Mezzanine ) Boilers ) Middle School North ( Qty 4 Boilers ) Middle School South ( Qty 2 Boilers ) Ethylene glycol used in secondary heating system , heated through a plate & frame heat exchanger : Ashley Elementary School Naldrett Elementary School o Subcontractor shall obtain all necessary applicable permits and approvals prior to commencement of scope of work . o Subcontractor shall provide all necessary labor and materials for complete implementation of boiler ( s ) and hot water pump ( s ) system and proper disposal of removed equipment ( not using owner ' s dumpsters and / or owner ' s refuse containers ). o Unless otherwise specified , point of new connection to be existing isolation valves for boiler ( s ) and hot water pump ( s ). o Subcontractor shall provide and receive submittal approval prior to ordering any materials associated with this scope of work . All work shall be performed in accordance with manufacturer specifications , state and local codes , and industry best practices . Products shall be installed only by qualified personnel experienced in the installation of boiler and pump systems |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage |
Article published date | 2026-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
