logo

Bolton House Road Site Waste Clearance

Active · United Kingdom

Source: Find a Tender Service (UK)

Tender
Active

You are invited to tender for the contract to clear waste illegally deposited on the Bolton House Road Site, Bickershaw, Wigan, WN2 4AB. It includes waste that has been deposited to the rear of the site on Diggle Flash (A nature reserve that is part of Bickershaw Country Park). The quantity of waste Wigan Council expects to be removed is estimated to be in the region of 18,000 tonnes. This is esti

Status
Bidding
Sector
Education, Road
Location
United Kingdom
Updated
3 Nov 2026
Source
Find a Tender Service (UK)

ConstructChat

Ask ConstructChat about Bolton House Road Site Waste Clearance

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

4 Q
The tender “Bolton House Road Site Waste Clearance” is a tender record in Taiyo, linked to the Education sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Bidding

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

You are invited to tender for the contract to clear waste illegally deposited on the Bolton House Road Site, Bickershaw, Wigan, WN2 4AB. It includes waste that has been deposited to the rear of the site on Diggle Flash (A nature reserve that is part of Bickershaw Country Park). The quantity of waste Wigan Council expects to be removed is estimated to be in the region of 18,000 tonnes. This is estimated following a LiDAR survey which calculated the volume of waste as 23,086 metres cubed. Wigan Council is conducting this procurement on an accelerated timetable due to an urgent requirement brought about by circumstances both unforeseeable and unattributable to Wigan Council. The urgent need is to clear an illegal waste site that presents an unacceptable risk to public health, environmental harm and outbreak of fire. Please note that the site has previously caught fire thus there remains a serious fire risk. The procurement timeline is reduced to c.15 days thus still allowing for sufficient competition. The breakdown of Lots for this urgent requirement isn't feasible for this requirement. In accordance with the principles of the Procurement Act 2023, Wigan Council considered whether the contract could be divided into lots. Following assessment, it was concluded that a single lot approach is appropriate due to the integrated nature of the urgent requirement and the need for consistent delivery, contract oversight along with supplier accountability.

Budget

Location

Country

United Kingdom (UK)

Source

Source

Find a Tender Service (UK)

URL

More Details

Record type

Tender

Sector

Education, Road

Article published date

2026-09-21

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender