Bond Johnson St Global Roof Replacement
The scope, dates and status of this tender. A free account opens every field.
Source: North Carolina Purchasing Group
A brief description of work in the project follows • Total Roof Size is approximately 40 , 000 sq ft . • Base Bid roof will require tear - off existing EPDM roofing membrane and insulation down to the original decks – Approximately 28 , 200 sq ft . • Alternate One will require tear - off existing gravel surface
- Status
- Closed
- Sector
- Metal, Road
- Location
- North Carolina, United States of America
- Updated
- 3 Nov 2026
- Source
- North Carolina Purchasing Group
ConstructChat
Ask ConstructChat about Bond Johnson St Global Roof Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | A brief description of work in the project follows • Total Roof Size is approximately 40 , 000 sq ft . • Base Bid roof will require tear - off existing EPDM roofing membrane and insulation down to the original decks – Approximately 28 , 200 sq ft . • Alternate One will require tear - off existing gravel surface asphalt built - up roofing membrane and insulation down to the original decks – Approximately 11 , 800 sq ft . • New insulation system shall be a minimum of 2 layers of polyisocyanurate foam boards with ½ ” gypsum overlayment board . All insulation to be adhered with spray - on urethane foam . Provide tapered insulation on roof areas as shown on roof plans . • The replacement membrane assembly consists of the application of a fleece backed PVC single - ply membrane fully adhered to the insulation assembly . Scope of Work includes installation of new perimeter wood nailers and edge metal . • Work includes all sheet metal fabrications shown on the contract documents and as specified . • Roofing system installation shall require on - going inspections by the Membrane Manufacturer during the installation process and will be eligible to receive a 20 - year NDL material and labor warranty , fullsystem including the insulation and membrane . • For bidding purposes , job start is estimated to be June 16 , 2026 . • Completion date is 180 calendar days after receiving a notice to proceed from the Owner . • The resulting contract will be to furnish all labor , supervision , materials and equipment necessary to perform the work as shown on the plans and described in the project specifications |
Location
Country | United States of America (USA) |
State | North Carolina |
Source
Source | North Carolina Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Metal, Road |
Article published date | 2026-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Metal tenders in United States of America
- Token Creek Roof Replacements
- HVAC Ice Machine Servicing and Sheet Metal Fabrication
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Various Locations Sewer Replacement No. 9 [BID TABULATION]
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Electrical (C-10 License), San Francisco, San Mateo, Santa C...
