logo

BPA Capital Programme CH1-3 and HR1-3

Sector: Solar • Location: United Kingdom

Source: Contracts Finder

Tender
Opportunity

Various building and services works, including acoustic, technical equipment and accessibility enhancements (new lift and lift refurbishments) and internalalterations to Snape Maltings Concert Hall.Alterations to existing energy centre to facilitate greateruse of sustainable heating and the provision of solar PV on roofs of the Hoffmann, the Winch Gallery and Flat Roofs adjacent to the Concert Hal

Status
Closed
Sector
Solar, Stadium, Commercial
Location
United Kingdom
Updated
3 Nov 2026
Source
Contracts Finder

ConstructChat

Ask ConstructChat about BPA Capital Programme CH1-3 and HR1-3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “BPA Capital Programme CH1-3 and HR1-3” is a tender record in Taiyo, linked to the Solar sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

opportunity

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Various building and services works, including acoustic, technical equipment and accessibility enhancements (new lift and lift refurbishments) and internalalterations to Snape Maltings Concert Hall.Alterations to existing energy centre to facilitate greateruse of sustainable heating and the provision of solar PV on roofs of the Hoffmann, the Winch Gallery and Flat Roofs adjacent to the Concert Hall. Procured through an initial Pre Qualification Questionnaire and then short listing to a competitive tender process.The works proposed comprise the following:Concert Hall (CH1 and CH2)CH1: Acoustic treatment to Concert Hall, installation of retractable bannersCH1: Performance Technical equipment upgrades and replacement (stage and house lighting, rigging systems, assisted listening)CH1: roof covering replacement and insulation on South, East & West faces; high level maintenance of "bluffs", structural repair / strengtheningCH2: refurbishment of WCs, fabric repairs (brickwork)CH2: ventilation improvements inc. new AHU; new lightingCH2: refurbishment of two existing lifts, one new platform liftCH2: remodelling of Discovery Centre for future exhibition spaceNB: audience seating improvements as a separate, client-led project, CH3 will have a dirrect interface and attendances requirementsHeating and Renewables (HR1, HR2 and HR3)HR1: consolidation of Energy Centre boilers, new District Heating and Cooling pipeworkHR2: Photovoltaic panels to Concert Hall lower south roof, Hoffmann building roofHR3: new site wide Building Management System (BMS)The works have Planning and Listed Building Consent.Project Manager / Contract Administrator Gardiner & TheobaldArchitect de Matos RyanStructural / Civil Engineer Price & MyersBuilding Services Engineer Ingleton WoodTheatre Specialist & Acoustician CharcoalblueQS BristowPlanning Consultant BidwellLandscape Architect Untitled Practice

Location

Country

United Kingdom (UK)

Source

Source

Contracts Finder

URL

More Details

Record type

Tender

Sector

Solar, Stadium, Commercial

Article published date

2026-02-26

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender