logo

Branford High School Roof Replacement

Closed · Connecticut · Last reported Apr 2026

Source: Connecticut Purchasing Group

Tender
Closed

A . ALL DIMENSIONS TO BE VERIFIED IN FIELD . B . ROOFING CONTRACTOR IS RESPONSIBLE FOR ALL WOOD BLOCKING . FLASHING AT DRAINS , CURBS , ROOF TRANSITIONS . ETC . ALL WOOD BLOCKING TO BE PRESERVATIVE TREATED . C . PROVIDE INSULATED EDGE STRIPS TO TRANSITIONS ROOFING BETWEEN HIGH POINTS AND LOW POINTS . D . WHERE MECHA

Status
Closed
Sector
Water Supply and Storage, Cement
Location
Connecticut, United States of America
Updated
3 Nov 2026
Source
Connecticut Purchasing Group

ConstructChat

Ask ConstructChat about Branford High School Roof Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Branford High School Roof Replacement” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Connecticut, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

A . ALL DIMENSIONS TO BE VERIFIED IN FIELD . B . ROOFING CONTRACTOR IS RESPONSIBLE FOR ALL WOOD BLOCKING . FLASHING AT DRAINS , CURBS , ROOF TRANSITIONS . ETC . ALL WOOD BLOCKING TO BE PRESERVATIVE TREATED . C . PROVIDE INSULATED EDGE STRIPS TO TRANSITIONS ROOFING BETWEEN HIGH POINTS AND LOW POINTS . D . WHERE MECHANICALLY FASTENING RIGID ROOF INSULATION TO ANY CONCRETE OR MASONRY BASE MATERIAL . PRE DRILL ALL HOLES PER MANUFACTURER INSTRUCTIONS . E . PATCH ALL ROOF OPENINGS . INCLUDING BUT NOT LIMITED TO : FORMER MECHANICAL PENETRATIONS . VENT PIPE . ETC . AS REQUIRED . F . PROVIDE ALL NEW PIPE EXTENSIONS AT EXISTING VENT PIPE PENETRATION FOR THE REQUIRED HEIGHT OF 8 " MIN . TYPICAL . G . ALL NEW ROOFS SHALL SLOPE AT 1 / 4 " PER FOOT ( MIN ) WITH 1 / 2 " CRICKET ( TYP .) H . CONTRACTOR SHALL CONFIRM THE DIMENSIONS OF THE EQUIPMENT BASES AND THE EXTENT OF THE TAPERED CRICKETS REQUIRED TO KEEP WATER OFF THE UNITS . I . COMPOSITION AND ARRANGEMENT OF EXISTING WOOD BLOCKING HAS NOT BEEN VERIFIED . INSTALL ALL NEW 2X P . T . BLOCKING ANCHORED TO DECK . ATTACH FASCIA AND FASCIA EXTENSION . MAINTAIN A CONSISTENT TOP OF WALL HEIGHT . TYPICAL . J . ELEVATION OF TOP OF FASCIA SHALL BE CONSISTENT FOR EACH ROOFING AREA EXCEPT WHERE ROOFING IS SLOPED AND THE DEPTH OF INSULATION CONTINUOUS . K . CONTRACTOR SHALL VERIFY MAXIMUM INSULATION THICKNESS , INCLUDING CRICKETS AND COVER BOARD , BEFORE SETTING BLOCKING AND ESTABLISHING THE TOP HEIGHT OF FASCIA . L . ALL MATERIAL ARE NEW UNLESS OTHERWISE NOTED EXISTING . M . PROVIDE WALKING PAO TO MECHANICAL EQUIPMENT AND OTHER ROOF MOUNTED FACILITIES AS INDICATED ON PLAN . N . TEMPORARILY REMOVE WITH CARE ROOF MOUNTED MECHANICAL EQUIPMENT AND ALL OTHER ROOF ACCESSORIES AS REQUIRED FOR THE PROPER EXECUTION OF THE WORK SO THAT BLOCKING SUFFICIENT TO RAISE THE UNIT TO 8 " MIN . CLEARANCE CAN SE INSTALLED . TEST TO ENSURE PROPERLY WORKING ONCE REINSTALLED .

Location

Country

United States of America (USA)

State

Connecticut

Source

Source

Connecticut Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Cement

Article published date

2026-05-05

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender