Branford High School Roof Replacement
Closed · Connecticut · Last reported Apr 2026
Source: Connecticut Purchasing Group
A . ALL DIMENSIONS TO BE VERIFIED IN FIELD . B . ROOFING CONTRACTOR IS RESPONSIBLE FOR ALL WOOD BLOCKING . FLASHING AT DRAINS , CURBS , ROOF TRANSITIONS . ETC . ALL WOOD BLOCKING TO BE PRESERVATIVE TREATED . C . PROVIDE INSULATED EDGE STRIPS TO TRANSITIONS ROOFING BETWEEN HIGH POINTS AND LOW POINTS . D . WHERE MECHA
- Status
- Closed
- Sector
- Water Supply and Storage, Cement
- Location
- Connecticut, United States of America
- Updated
- 3 Nov 2026
- Source
- Connecticut Purchasing Group
ConstructChat
Ask ConstructChat about Branford High School Roof Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | A . ALL DIMENSIONS TO BE VERIFIED IN FIELD . B . ROOFING CONTRACTOR IS RESPONSIBLE FOR ALL WOOD BLOCKING . FLASHING AT DRAINS , CURBS , ROOF TRANSITIONS . ETC . ALL WOOD BLOCKING TO BE PRESERVATIVE TREATED . C . PROVIDE INSULATED EDGE STRIPS TO TRANSITIONS ROOFING BETWEEN HIGH POINTS AND LOW POINTS . D . WHERE MECHANICALLY FASTENING RIGID ROOF INSULATION TO ANY CONCRETE OR MASONRY BASE MATERIAL . PRE DRILL ALL HOLES PER MANUFACTURER INSTRUCTIONS . E . PATCH ALL ROOF OPENINGS . INCLUDING BUT NOT LIMITED TO : FORMER MECHANICAL PENETRATIONS . VENT PIPE . ETC . AS REQUIRED . F . PROVIDE ALL NEW PIPE EXTENSIONS AT EXISTING VENT PIPE PENETRATION FOR THE REQUIRED HEIGHT OF 8 " MIN . TYPICAL . G . ALL NEW ROOFS SHALL SLOPE AT 1 / 4 " PER FOOT ( MIN ) WITH 1 / 2 " CRICKET ( TYP .) H . CONTRACTOR SHALL CONFIRM THE DIMENSIONS OF THE EQUIPMENT BASES AND THE EXTENT OF THE TAPERED CRICKETS REQUIRED TO KEEP WATER OFF THE UNITS . I . COMPOSITION AND ARRANGEMENT OF EXISTING WOOD BLOCKING HAS NOT BEEN VERIFIED . INSTALL ALL NEW 2X P . T . BLOCKING ANCHORED TO DECK . ATTACH FASCIA AND FASCIA EXTENSION . MAINTAIN A CONSISTENT TOP OF WALL HEIGHT . TYPICAL . J . ELEVATION OF TOP OF FASCIA SHALL BE CONSISTENT FOR EACH ROOFING AREA EXCEPT WHERE ROOFING IS SLOPED AND THE DEPTH OF INSULATION CONTINUOUS . K . CONTRACTOR SHALL VERIFY MAXIMUM INSULATION THICKNESS , INCLUDING CRICKETS AND COVER BOARD , BEFORE SETTING BLOCKING AND ESTABLISHING THE TOP HEIGHT OF FASCIA . L . ALL MATERIAL ARE NEW UNLESS OTHERWISE NOTED EXISTING . M . PROVIDE WALKING PAO TO MECHANICAL EQUIPMENT AND OTHER ROOF MOUNTED FACILITIES AS INDICATED ON PLAN . N . TEMPORARILY REMOVE WITH CARE ROOF MOUNTED MECHANICAL EQUIPMENT AND ALL OTHER ROOF ACCESSORIES AS REQUIRED FOR THE PROPER EXECUTION OF THE WORK SO THAT BLOCKING SUFFICIENT TO RAISE THE UNIT TO 8 " MIN . CLEARANCE CAN SE INSTALLED . TEST TO ENSURE PROPERLY WORKING ONCE REINSTALLED . |
Location
Country | United States of America (USA) |
State | Connecticut |
Source
Source | Connecticut Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Cement |
Article published date | 2026-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
