Bsp Region 1 Ada Kayak Launch Dock Systems
Bids closed Apr 2026 · Pennsylvania · Last reported Apr 2026
Source: Pennsylvania Purchasing Group
The Department of Conservation and Natural Resources , Bureau of State Parks , requires a vendor to furnish and deliver ( 2 ) EZ - Dock Manufactured EZ Launch Drive Through ADA Systems – ( 1 ) to Hills Creek State Park , Tioga County and ( 1 ) to Bald Eagle State Park , Centre County . CONTRACT REQUIREMENTS : Furnish
- Status
- Closed
- Sector
- Metal, Steel, Rail, Commercial
- Location
- Pennsylvania, United States of America
- Updated
- 3 Nov 2026
- Source
- Pennsylvania Purchasing Group
ConstructChat
Ask ConstructChat about Bsp Region 1 Ada Kayak Launch Dock Systems
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Department of Conservation and Natural Resources , Bureau of State Parks , requires a vendor to furnish and deliver ( 2 ) EZ - Dock Manufactured EZ Launch Drive Through ADA Systems – ( 1 ) to Hills Creek State Park , Tioga County and ( 1 ) to Bald Eagle State Park , Centre County . CONTRACT REQUIREMENTS : Furnish two ( 2 ) EZ Launch ADA Systems . Each system shall meet or exceed the specifications listed below . Note that these are specific launches to each location . One system will be for Hills Creek State Park and one system will be for Bald Eagle State Park . Dock System # 1HILLS CREEK STATE PARK ( TIOGA CO .)( See Sketch for Design ) EZ - DOCK Accessible one - way Kayak Launch .· Beige Color .· See sketch for design .· One way launch parallel to shore .· Launch to have Upgraded Wheel Roller system .· Dock to have 10 ' x17 ' 9 " platform with transfer bench .· Dock Platform to have 2 - 1 / 2 " x3 - 1 / 2 " Brown plastic curbing screwed to docks to prevent roll off .· Launch to be held in place with Gangway .· Gangway is 8 ' x12 ' aluminum gangway with Thru flow decking . Gangway to have ADA railings with toe kicks and loops at ends .· Gangway to be hinged to dock using a 5 - pocket hinge for stability .· Gangway to be bolted to abutment with 8 ' hinge . 1 . Dock Section :• Dock Section , 80 ” x 120 ” ( QTY 2 )• Dock Section , 60 ” x 120 ” ( QTY 1 )• Coupler Set with Composite Rod ( QTY 12 )• Dock Curbing Plastic 2 ½ ” x 3 ½ ” x 116 ” ( no screws ) ( QTY 5 )• 3 ” Flathead screws for curbing ( QTY 44 ) 2 . Aluminum Gangway :• TM Aluminum Gangway 8 ’ x 12 ’ ADA Gangway ( No Deck ) ( QTY 1 )• TM Aluminum Gangway – Handrail Loop Commercial ( QTY 4 )• TM Aluminum – General abutment hinge STD Duty – 8 ’ W ( QTY 1 )• TM Aluminum 8 ’ EZ Dock 5 pocket hinge ( QTY 1 )• Connector , Male w / 5 / 8 ” SS bolt and nut ( QTY 5 )• ThruFlow LEGACY XP Panel ( 1 ’ x 4 ’) ( Maple ) ( QTY 24 )• ThruFlow screws stainless ( QTY 192 ) 3 . Launch Section :• EZ Port Max Entry ( QTY 1 )• EZ Port Max Extension ( QTY 1 )• EZ Port Coupler Set 2 pair , Port to Port ( QTY 1 )• Kayak Launch Roller Kit ( QTY 1 )• Kit Kayak Launch One Way Extension L or R ( QTY 1 )• EZ Launch Single Entry Railing Right ( QTY 1 )• EZ Launch Accessible Transfer w / Support Grab Rail & Sign ( QTY 1 )• Hinge Kit EZ Dock - to - port Max 1 pair ( QTY 1 ) Dock System # 2BALD EAGLE STATE PARK ( CENTRE CO .)( See Sketch for Design ) EZ - DOCK Accessible two - way Kayak Launch .· Beige color .· See sketch for design .· 2 way launch perpendicular to shore .· Launch to have Upgraded Wheel Roller system .· Dock to have 10 ' x13 ' platform with transfer bench .· Additional dock sections to provide space for gangway and transition plate .· Launch to be held in place with 4 - 3 . 5 " HD pipe brackets with 2 . 5 " galvanized pipe covered with 3 " PVC pipe sleeves .· Platform to have 2 - 1 / 2 " x3 - 1 / 2 " Brown plastic curbing screwed down around perimeter of dock .· Gangway is a modular 4 ' x24 ' aluminum gangway with Thru flow decking . Gangway to haveADA railings with toe kicks and loops at ends .· 4 ' x4 ' transition plate on end of gangway .· Gangway to be bolted to abutment and sit on dock with rollers .· Aluminum plate under rollers to protect dock surface . |
Location
Country | United States of America (USA) |
State | Pennsylvania |
Source
Source | Pennsylvania Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Metal, Steel, Rail, Commercial |
Article published date | 2026-05-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Metal tenders in United States of America
- Token Creek Roof Replacements
- HVAC Ice Machine Servicing and Sheet Metal Fabrication
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Various Locations Sewer Replacement No. 9 [BID TABULATION]
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Electrical (C-10 License), San Francisco, San Mateo, Santa C...
