Buckley Sfb Rectifier Inverter System Replacement
Sector: Energy Storage • Location: Aurora, Colorado, United States of America
Source: SAM.gov
The purpose of this Sources Sought is for market research purposes only to obtain a list of capable vendors. Please see attached Statement of Need for all requirements. Please include 2d Lt Maurice Epps email: or TSgt Matthew Kennedy email: on all communications. The replacement rectifier must meet or exceed the current amp load of the exist
- Status
- Closed
- Sector
- Energy Storage, Aerospace & Defense, Manufacturing (Industrial), Government, Power Generation (CCGT), Commercial, Residential
- Location
- Aurora, Colorado, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Buckley Sfb Rectifier Inverter System Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | sources sought |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The purpose of this Sources Sought is for market research purposes only to obtain a list of capable vendors. Please see attached Statement of Need for all requirements. Please include 2d Lt Maurice Epps email: maurice.epps@spaceforce.mil or TSgt Matthew Kennedy email: matthew.kennedy.24@us.af.mil on all communications. The replacement rectifier must meet or exceed the current amp load of the existing system of 2,800 amps (200amps x 14 units). The contractor shall install batteries equivalence or better than the existing batteries (C&D Technologies MS Endur II). The quantity of existing batteries are 3 strings with 48 jars per string. Each string shall include battery disconnects equivalent or better than the existing units (Peco II, -48v 1800 amp) The system must feed new power distribution to the D/C breaker panel to include load A,B,C,D from commercial power, battery power and generator power sources. The power distribution must meet or exceed the existing unit (Lorain Power System Model 1231v1) Power must feed into the A,B,C,D,E and F sectors of the DC breaker panel. The inverter system must accommodate the existing DC breaker panels and A/C circuits within the node facility. |
Original sector | Not Identified |
Location
Country | United States of America (USA) |
State | Colorado |
City | Aurora |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Energy Storage, Aerospace & Defense, Manufacturing (Industrial), Government, Power Generation (CCGT), Commercial, Residential |
Article published date | 2026-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Energy Storage tenders in United States of America
- HOUSEHOLD SINGLEUSE RECHARGEABLE BATTERY COLLECTION AND RECYCLING SERVICES
- BATTERIES FOR SURVEILLANCE EQUIPMENT
- Southeast Water Pollution Control Plant Power Feed and Prima...
- Flashlights and Batteries
- IFB 970302022LW Flashlights and Accessories
- Power Utility Rate Consulting Services for 2021 Electric Rates Study
- RFP - Portable Mass Spectrometer Device
- Southeast Water Pollution Control Plant Power Feed and Prima...
