Buffalo Creek Boiler Replacement
One of 10,000+ tenders Taiyo tracks in Colorado.
Source: SAM.gov
Project: Buffalo Creek Boiler Replacement POC: Erick Plamann, Contract Specialist, for the replacement of one boiler as outline in attachment 3 Statement of Work (SOW). A- Propane Gas-Fire Boiler - The work shall consist of supplying and installing (1) high efficiency propane gas-fired boiler approved equivalent to the Dunkirk Quantum 90, Q90-200, see attached specifications
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Commercial, Raw Materials, Residential
- Location
- Pine, Colorado, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Buffalo Creek Boiler Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Project: Buffalo Creek Boiler Replacement POC: Erick Plamann, Contract Specialist, erick.plamann@usda.gov for the replacement of one boiler as outline in attachment 3 Statement of Work (SOW). A- Propane Gas-Fire Boiler - The work shall consist of supplying and installing (1) high efficiency propane gas-fired boiler approved equivalent to the Dunkirk Quantum 90, Q90-200, see attached specifications Attachment 05, at the Buffalo Creek Work Center. Work shall also include the furnishment/installation of any/all plumbing/electrical/expansion tanks/new solenoids/water lines/regulators/miscellaneous components needed for a successful installation. B- Backflow Preventer Replacement – Replace one (1) Caleffi 573012A ½” 573 Backflow Preventer and AutoFill Combination with Pressure Gauge, and one two-way ball valve. C. F- m Water Line Replacement – Replace approximately 5 feet of 1” copper water line, approximately 6 feet of ¾” copper water line, and approximately 3 feet of ½” copper waterline D-Electrical Panel Upgrade – Convert the two (2) outdated electrical panels, located in the entry stairway and attic, respectively, with junction boxes and extend circuits to one (1) new electrical panel. Ensure all new work is appropriately grounded. F-Mold Remediation - Water damage mitigation of the boiler room. Includes temporary removal of plumbing system as necessary, tearing out contaminated plywood and wet insulation, cleaning stud walls, walls, and ceiling, performing detailed HEPA vacuuming, and applying a plant-based antimicrobial agent. F- Boiler Room Interior Reconstruction - The reconstruction phase includes restoring the boiler room and surrounding areas after mitigation. Magnitude of Construction is between $25,000 and $100,000 Site Visit: P.O.C. Name: Corey Lewenkamp Address: 18046 CO RD 126 Pine CO, 80470 Date and Time: February 25, 2026, 1:00 PM Mountain Telephone: 719-744-7196 P.O.C. Email: corey.lewenkamp@usda.gov Attachment 1 Solicitation Terms and Conditions Attachment 2 SOI Attachment 3 SOW Attachment 4 BCWC Dwelling Mech & Elec Systems Info Attachment 5- Product Specs Attachment 6- Wage Determination Questions shall be submitted via email to Erick Plamann, Contract Specialist at erick.plamann@usda.gov no later than March 4, 2026, at 12:00 PM Central Time. Quotes shall be submitted via email to Erick Plamann, Contract Specialist at erick.plamann@usda.gov no later than 12:00 p.m. Central Time on March 13, 2026. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Colorado |
City | Pine |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Metal, Commercial, Raw Materials, Residential |
Article published date | 2026-03-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
