logo

Buffalo Creek Boiler Replacement

Combined synopsis/solicitation · Colorado

Source: SAM.gov

Tender
Combined Synopsis/Solicitation

Project: Buffalo Creek Boiler Replacement POC: Erick Plamann, Contract Specialist, for the replacement of one boiler as outline in attachment 3 Statement of Work (SOW). A- Propane Gas-Fire Boiler - The work shall consist of supplying and installing (1) high efficiency propane gas-fired boiler approved equivalent to the Dunkirk Quantum 90, Q90-200, see attached specifications

Status
Closed
Sector
Water Supply and Storage, Raw Materials, Residential, Metal, Commercial
Location
Pine, Colorado, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Buffalo Creek Boiler Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Buffalo Creek Boiler Replacement” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Pine, Colorado, United States of America.

Participants

Not available for this record.

Status

Original status

combined synopsis/solicitation

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Project: Buffalo Creek Boiler Replacement POC: Erick Plamann, Contract Specialist, erick.plamann@usda.gov for the replacement of one boiler as outline in attachment 3 Statement of Work (SOW). A- Propane Gas-Fire Boiler - The work shall consist of supplying and installing (1) high efficiency propane gas-fired boiler approved equivalent to the Dunkirk Quantum 90, Q90-200, see attached specifications Attachment 05, at the Buffalo Creek Work Center. Work shall also include the furnishment/installation of any/all plumbing/electrical/expansion tanks/new solenoids/water lines/regulators/miscellaneous components needed for a successful installation. B- Backflow Preventer Replacement – Replace one (1) Caleffi 573012A ½” 573 Backflow Preventer and AutoFill Combination with Pressure Gauge, and one two-way ball valve. C. F- m Water Line Replacement – Replace approximately 5 feet of 1” copper water line, approximately 6 feet of ¾” copper water line, and approximately 3 feet of ½” copper waterline D-Electrical Panel Upgrade – Convert the two (2) outdated electrical panels, located in the entry stairway and attic, respectively, with junction boxes and extend circuits to one (1) new electrical panel. Ensure all new work is appropriately grounded. F-Mold Remediation - Water damage mitigation of the boiler room. Includes temporary removal of plumbing system as necessary, tearing out contaminated plywood and wet insulation, cleaning stud walls, walls, and ceiling, performing detailed HEPA vacuuming, and applying a plant-based antimicrobial agent. F- Boiler Room Interior Reconstruction - The reconstruction phase includes restoring the boiler room and surrounding areas after mitigation. Magnitude of Construction is between $25,000 and $100,000 Attachment 1 Solicitation Terms and Conditions Attachment 2 SOI Attachment 3 SOW Attachment 4 BCWC Dwelling Mech & Elec Systems Info Attachment 5- Product Specs Attachment 6- Wage Determination Questions shall be submitted via email to Erick Plamann, Contract Specialist at erick.plmann@usda.gov no later than March 4, 2026, at 12:00 PM Central Time. Quotes no later than 12:00 p.m. Central Time on March 13, 2026

Original sector

Construction

Location

Country

United States of America (USA)

State

Colorado

City

Pine

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Raw Materials, Residential, Metal, Commercial

Article published date

2026-02-12

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender