Building 4008 Lead and Asbestos Abatement

Sector: Metal • Location: California, United States of America

Source: California Purchasing Group

Tender
Closed

2 . 1 . 1 . 1 Provide all labor , materials , equipment , supervision , services , and disposal necessary to complete the abatement of all lead - based paint ( LBP ) materials in the building and that are identified in the McKenna Environmental Report for Building 4008 dated June 20 , 2025 . 2 . 1 . 1 . 2 All painted surf

Status
Closed
Sector
Metal, Government, Water Supply and Storage, Commercial, Residential
Location
California, United States of America
Updated
3 Nov 2026
Source
California Purchasing Group

ConstructChat

Ask ConstructChat about Building 4008 Lead and Asbestos Abatement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Building 4008 Lead and Asbestos Abatement” is a tender record in Taiyo, linked to the Metal sector. It is issued for works, goods, or services related to California, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

2 . 1 . 1 . 1 Provide all labor , materials , equipment , supervision , services , and disposal necessary to complete the abatement of all lead - based paint ( LBP ) materials in the building and that are identified in the McKenna Environmental Report for Building 4008 dated June 20 , 2025 . 2 . 1 . 1 . 2 All painted surfaces in building are assumed to contain lead paint . 2 . 1 . 1 . 3 Establish regulated work areas , and engineering controls 2 . 1 . 1 . 4 Abate and dispose of all identified LBP per applicable standards . 2 . 1 . 1 . 5 Abated items include but are not limited to the following ; 2 . 1 . 1 . 5 . 1 All painted materials . 2 . 1 . 1 . 5 . 2 Doors , jambs , moldings . 2 . 1 . 1 . 5 . 3 Windows , jambs , frames , moldings . 2 . 1 . 1 . 5 . 4 Wood siding . 2 . 1 . 1 . 5 . 5 Wall and ceiling coverings . 2 . 1 . 1 . 5 . 6 Moldings and trims . 2 . 1 . 1 . 5 . 7 Interior walls . 2 . 1 . 1 . 5 . 8 Flooring materials . 2 . 1 . 1 . 5 . 9 Cabinets , shelves , furnishings . 2 . 1 . 1 . 5 . 10 All loose materials found onsite . 2 . 1 . 1 . 6 LBP materials that cannot be abated ( such as structural framing components , exterior wall framing , and ceiling joists ) are to be encapsulated with a product that is white in color , water based , zero V . O . C ., and meets ASTM E1795 standard for non - reinforced liquid coating encapsulation for lead paint in buildings per manufacturer ’ s instructions . 2 . 1 . 1 . 7 All LBP materials shall be contained so as not to contaminate the ground soil . 2 . 1 . 1 . 8 Package , label , transport , and dispose of all hazardous waste in compliance with all State , Federal and local agencies and their regulations . Some agencies are but not limited to ; EPA , OSHA , NGB , Army Corps of Engineers , CALOSHA , California DTSC regulations County of San Luis Obispo , and Camp Roberts Environmental office . 2 . 1 . 1 . 9 Contractor shall employ a third party to oversee and certify abatement completion . 2 . 1 . 1 . 9 . 1 Certification shall be determined in accordance with applicable federal and state lead regulations , including any required visual inspections and laboratory testing . 2 . 1 . 1 . 10 Camp Roberts Project Manager ( PM ) will have direct contact with the thirdparty organization contracted to conduct oversight and always have access reports during the project . 2 . 1 . 1 . 11 Contractor shall collect a representative sample of all wood and metal in all paint colors . All building components shall be represented proportionally in the sample . 2 . 1 . 1 . 12 Samples shall be analyzed and characterized for hazardous waste profiling per RCRA and California DTSC requirements including at a minimum ; TTLC , STLC , and TCLP ( lead only ), sufficient to meet the needs of the disposal facility . If the disposal facility requires additional sampling and analyses , the contractor shall provide it as well . 2 . 1 . 1 . 13 All manifests shall be signed by John Morrow , or his approved environmental representative prior to removal from Camp Roberts facility . 2 . 1 . 1 . 14 All hazardous materials shall be transported by a licensed hazardous waste hauler to an approved disposal facility permitted to accept lead waste . 2 . 1 . 1 . 15 Contractor shall provide all Hazardous Waste Manifests , Bills of Lading , and Certificates of Disposal to the Government Representative within five ( 5 ) working days of disposal .

Location

Country

United States of America (USA)

State

California

Source

Source

California Purchasing Group

URL

More Details

Record type

Tender

Sector

Metal, Government, Water Supply and Storage, Commercial, Residential

Article published date

2026-05-10

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender