Building 4008 Lead and Asbestos Abatement
Sector: Metal • Location: California, United States of America
Source: California Purchasing Group
2 . 1 . 1 . 1 Provide all labor , materials , equipment , supervision , services , and disposal necessary to complete the abatement of all lead - based paint ( LBP ) materials in the building and that are identified in the McKenna Environmental Report for Building 4008 dated June 20 , 2025 . 2 . 1 . 1 . 2 All painted surf
- Status
- Closed
- Sector
- Metal, Government, Water Supply and Storage, Commercial, Residential
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about Building 4008 Lead and Asbestos Abatement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 2 . 1 . 1 . 1 Provide all labor , materials , equipment , supervision , services , and disposal necessary to complete the abatement of all lead - based paint ( LBP ) materials in the building and that are identified in the McKenna Environmental Report for Building 4008 dated June 20 , 2025 . 2 . 1 . 1 . 2 All painted surfaces in building are assumed to contain lead paint . 2 . 1 . 1 . 3 Establish regulated work areas , and engineering controls 2 . 1 . 1 . 4 Abate and dispose of all identified LBP per applicable standards . 2 . 1 . 1 . 5 Abated items include but are not limited to the following ; 2 . 1 . 1 . 5 . 1 All painted materials . 2 . 1 . 1 . 5 . 2 Doors , jambs , moldings . 2 . 1 . 1 . 5 . 3 Windows , jambs , frames , moldings . 2 . 1 . 1 . 5 . 4 Wood siding . 2 . 1 . 1 . 5 . 5 Wall and ceiling coverings . 2 . 1 . 1 . 5 . 6 Moldings and trims . 2 . 1 . 1 . 5 . 7 Interior walls . 2 . 1 . 1 . 5 . 8 Flooring materials . 2 . 1 . 1 . 5 . 9 Cabinets , shelves , furnishings . 2 . 1 . 1 . 5 . 10 All loose materials found onsite . 2 . 1 . 1 . 6 LBP materials that cannot be abated ( such as structural framing components , exterior wall framing , and ceiling joists ) are to be encapsulated with a product that is white in color , water based , zero V . O . C ., and meets ASTM E1795 standard for non - reinforced liquid coating encapsulation for lead paint in buildings per manufacturer ’ s instructions . 2 . 1 . 1 . 7 All LBP materials shall be contained so as not to contaminate the ground soil . 2 . 1 . 1 . 8 Package , label , transport , and dispose of all hazardous waste in compliance with all State , Federal and local agencies and their regulations . Some agencies are but not limited to ; EPA , OSHA , NGB , Army Corps of Engineers , CALOSHA , California DTSC regulations County of San Luis Obispo , and Camp Roberts Environmental office . 2 . 1 . 1 . 9 Contractor shall employ a third party to oversee and certify abatement completion . 2 . 1 . 1 . 9 . 1 Certification shall be determined in accordance with applicable federal and state lead regulations , including any required visual inspections and laboratory testing . 2 . 1 . 1 . 10 Camp Roberts Project Manager ( PM ) will have direct contact with the thirdparty organization contracted to conduct oversight and always have access reports during the project . 2 . 1 . 1 . 11 Contractor shall collect a representative sample of all wood and metal in all paint colors . All building components shall be represented proportionally in the sample . 2 . 1 . 1 . 12 Samples shall be analyzed and characterized for hazardous waste profiling per RCRA and California DTSC requirements including at a minimum ; TTLC , STLC , and TCLP ( lead only ), sufficient to meet the needs of the disposal facility . If the disposal facility requires additional sampling and analyses , the contractor shall provide it as well . 2 . 1 . 1 . 13 All manifests shall be signed by John Morrow , or his approved environmental representative prior to removal from Camp Roberts facility . 2 . 1 . 1 . 14 All hazardous materials shall be transported by a licensed hazardous waste hauler to an approved disposal facility permitted to accept lead waste . 2 . 1 . 1 . 15 Contractor shall provide all Hazardous Waste Manifests , Bills of Lading , and Certificates of Disposal to the Government Representative within five ( 5 ) working days of disposal . |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Metal, Government, Water Supply and Storage, Commercial, Residential |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Metal tenders in United States of America
- Token Creek Roof Replacements
- HVAC Ice Machine Servicing and Sheet Metal Fabrication
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Various Locations Sewer Replacement No. 9 [BID TABULATION]
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Electrical (C-10 License), San Francisco, San Mateo, Santa C...
