Building 58 Demolition
One of 10,000+ tenders Taiyo tracks in California.
Source: California Purchasing Group
a . Contractor agrees to provide to CMD Building 58 Demolition services , as described herein : Contractor shall provide all materials , labor , bonds , licenses , insurance , equipment , tools , permits , taxes , transportation , and fees to Lead and Asbestos Containing Materials ( ACM ) and complete the demolition of Building
- Status
- Closed
- Sector
- Geothermal, Aerospace & Defense, Government, Commercial
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about Building 58 Demolition
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | a . Contractor agrees to provide to CMD Building 58 Demolition services , as described herein : Contractor shall provide all materials , labor , bonds , licenses , insurance , equipment , tools , permits , taxes , transportation , and fees to Lead and Asbestos Containing Materials ( ACM ) and complete the demolition of Building 58 and disposing of and all associated site utilities . SCOPE OF WORK : Work will consist of furnishing notifications , Lead & Asbestos testing / reports , permits , fees , labor , materials , disposal needs , equipment , warranties , and third - party monitoring agency to remove all Lead and Asbestos Containing Materials ( ACM ) and complete the demolition of Building 58 and disposing of and all associated site utilities . Work will include raze and dispose of all building components . Demo and dispose of all site flat work ( sidewalks , driveways , mechanical pads , etc .). Utilities shall be terminated and capped at 10 feet from the building perimeter . Grounds surrounding the facility shall be graded and leveled with appropriate vegetation planted meeting adjacent grounds . All work shall comply with this scope of work and the attached specification . Contractor will have 300 Calendar Days to complete the project . An approved Safety Plan and Abatement Plan with appointment letters for Site Superintendent , Quality Control and Site Safety Officer are required as submittals . Material submittals for all materials are required . Site Superintendent and Safety Officer ( can be one person ) or an approved alternate are required to be on site at all time that work is being performed . Contractor will follow CAL OSHA for safety and health . All work shall comply with trade standards local , State of California , and federal regulations . Project will also comply with applicable UBC / CBC codes and UFCs . The following UFC ’ s listed below will be followed : UFC 1 - 200 - 01 DoD Building Code , w / change 2 Unified Facilities Guide Specifications \ 1 . BACKGROUND : Joint Forces Training Base , Los Alamitos is an operating Military Installation and Airfield that meets Department of Defense standards to provide Support and training facilities for military units and other National , State and Local Organizations , to include Emergency Operations . Bidding of this scope shall include prevailing wages , payment and performance bond . 2 . LOCATION : work site is BLDG 58 , JFTB 4221 Saratoga Ave . Los Alamitos , California 90720 . 3 . PRINCIPLE FEATURES : The work to be performed will include the following items : 3 . 1 ASBESTOS / LBP ABATEMENT : 3 . 1 . 1 The building has been tested for lead - based paint ( LBP ) and asbestos containing material ( ACM ), report attached dated 14 April 2017 . The contractor is responsible for performing a current LBP & ACM Test and providing the report to the Government . Contractor shall employ a third party to oversee and certify abatement completion . 3 . 1 . 2 Joint Forces Training Base , DPW , the Project Manager and CM , will have direct contact with the third - party organization contracted to conduct oversight and have access reports at all times during the project . A copy of all disposal manifests and close out documents shall be provided to the CM prior to the authorization of final payment . Manifest shall be signed by Tom Tandoc , or the post environmental representative . 3 . 1 . 3 The following materials have been identified in Buildings on Post and are assumed to be located throughout and are to be considered Asbestos Containing Materials ( ACM ) and Lead Based Paint ( LBP ) and should be disposed of IAW applicable regulations . 1 . TSI pipe insulation 2 . 9 - inch vinyl composition floor tile 3 . Floor mastics ( Black ) 4 . Window glazing 5 . Paint 6 . Wall plaster 7 . Fibrous woven wire insulation 8 . Cementitious - transite paneling and transite pipes 9 . Thermal Systems Insulation / mud elbows / fibrous jacketing on pipes , boilers , and furnace units 10 . Any unforeseen piping or vents . 11 . Gaskets inside pipeline flanges , sprinkler systems and toilets 12 . Interior painted surfaces , walls and baseboards 13 . Roofing - Mastic including vents and ducting 3 . 1 . 4 LBPs are assumed to be on all painted surfaces throughout the interior and exterior of the building . |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Geothermal, Aerospace & Defense, Government, Commercial |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Geothermal tenders in United States of America
- Biosolids Digester Facilities Project Request / Notice for P...
- Oceanside Water Pollution Control Plant Digester Gas Utiliza...
- MultiSensor HD Thermal Imaging Camera and Helicopter Installation
- ZEBRA ZD421 DIRECT THERMAL DESKTOP PRINTER
- Southeast Treatment Plant (SEP) Biogas Utilization Project
- Induction Mast Standpipe Thermal Spray Repair Services
- Induction Mast Standpipe Thermal Spray Repair Services
- U.S. Department Of Transportation Small Business Innovation Research Fiscal Year 2026 Phase I Solicitation
