logo

Building Safety Act Principle Designer Cath Lab 3 Refurbishment

Sector: Commercial • Location: United Kingdom

Source: Open Contracting Data Standard (OCDS)

Tender
Active

The Authority has a requirement for Principal Designer Services to take the lead in planning, managing, monitoring and coordinating health and safety during the pre-construction (design and planning stage) and during construction stages for the Cath Lab 3 refurbishment. The Authority wishes to engage with a principal designer to work closely with the project team, coordinating the work of others

Status
Bidding
Sector
Commercial, Hospital
Location
United Kingdom
Updated
3 Nov 2026
Source
Open Contracting Data Standard (OCDS)

ConstructChat

Ask ConstructChat about Building Safety Act Principle Designer Cath Lab 3 Refurbishment

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Building Safety Act Principle Designer Cath Lab 3 Refurbishment” is a tender record in Taiyo, linked to the Commercial sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Bidding

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Authority has a requirement for Principal Designer Services to take the lead in planning, managing, monitoring and coordinating health and safety during the pre-construction (design and planning stage) and during construction stages for the Cath Lab 3 refurbishment. The Authority wishes to engage with a principal designer to work closely with the project team, coordinating the work of others and ensuring significant and foreseeable risks are managed throughout the design process. The Authority wishes to engage with a principal designer to work closely with the project team, coordinating the work of others and ensuring significant and foreseeable risks are managed throughout the design process. The Project Guys and St Thomas’ NHS Foundation Trust (GSTT) are to replacing their existing Cardiac Catheter Laboratory medical equipment and refurbishing the existing facilities within Cardiac Catheter Laboratory (Cath Lab No.3) at 4th floor level of the East Wing of the St Thomas’ Hospital site. The Project has been designed and prepared to completion of RIBA 4.

Location

Country

United Kingdom (UK)

Source

Source

Open Contracting Data Standard (OCDS)

URL

More Details

Record type

Tender

Sector

Commercial, Hospital

Article published date

2026-06-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender