Building Safety Act Principle Designer Cath Lab 3 Refurbishment
Sector: Hospital • Location: United Kingdom
Source: Find a Tender Service (UK)
The Authority has a requirement for Principal Designer Services to take the lead in planning, managing, monitoring and coordinating health and safety during the pre-construction (design and planning stage) and during construction stages for the Cath Lab 3 refurbishment. The Authority wishes to engage with a principal designer to work closely with the project team, coordinating the work of others
- Status
- Bidding
- Sector
- Hospital, Commercial
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Find a Tender Service (UK)
ConstructChat
Ask ConstructChat about Building Safety Act Principle Designer Cath Lab 3 Refurbishment
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Bidding |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Authority has a requirement for Principal Designer Services to take the lead in planning, managing, monitoring and coordinating health and safety during the pre-construction (design and planning stage) and during construction stages for the Cath Lab 3 refurbishment. The Authority wishes to engage with a principal designer to work closely with the project team, coordinating the work of others and ensuring significant and foreseeable risks are managed throughout the design process. The Authority wishes to engage with a principal designer to work closely with the project team, coordinating the work of others and ensuring significant and foreseeable risks are managed throughout the design process. The Project Guys and St Thomas’ NHS Foundation Trust (GSTT) are to replacing their existing Cardiac Catheter Laboratory medical equipment and refurbishing the existing facilities within Cardiac Catheter Laboratory (Cath Lab No.3) at 4th floor level of the East Wing of the St Thomas’ Hospital site. The Project has been designed and prepared to completion of RIBA 4. |
Budget |
Location
Country | United Kingdom (UK) |
Source
Source | Find a Tender Service (UK) |
URL |
More Details
Record type | Tender |
Sector | Hospital, Commercial |
Article published date | 2026-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
