Bus Garage Roof Remediation
Closed · MITN · Last reported Feb 2026
Source: MITN Purchasing Group
Roof Area ( s ) / Section ( s ): Bus Garage . a . Total Area of Roof ( s ): 17 , 000 sq . ft . b . Slope of Existing Roof :. c . The Work of the Project includes : 1 ) Remove any dead exhaust vents and overlay new metal panel and secure in place . 2 ) Install two layers of 2 . 6 " of polyisocyanurate insulation and
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Car parking, Automotive
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Bus Garage Roof Remediation
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Roof Area ( s ) / Section ( s ): Bus Garage . a . Total Area of Roof ( s ): 17 , 000 sq . ft . b . Slope of Existing Roof :. c . The Work of the Project includes : 1 ) Remove any dead exhaust vents and overlay new metal panel and secure in place . 2 ) Install two layers of 2 . 6 " of polyisocyanurate insulation and mechanically fasten insulation to purlins per manufacturer ' s instructions . 3 ) Low - rise 1 / 4 " primed densdeck to new insulation substrate . 4 ) Install new wood blocking around entire perimeter ensuring fasteners are secured through panel into purlins / structure . 5 ) Build out walls above lounge with insulation & wood blocking to provide smooth transition between roof sections . 6 ) Adhere new Tremply TPO Max 60mil to the new densdeck coverboard . 7 ) Wrap vertical walls above lounge with membrane to ensure water tightness from section to section . 8 ) Install new Tremlock drip edge metal system around the entire perimeter . 9 ) Install all related details per manufacturer ' s installation requirements . 10 ) Install new compatible S - 5 snow retention system above lounge area . 11 ) Provide manufacturer inspections & reporting throughout the entirety of the project . 12 ) Provide 20 - year QA Warranty with inspections & housekeeping in years 2 , 5 , 10 , 15 . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Metal, Car parking, Automotive |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
