C-17 Air Mobility Command Airlift Recapitalization Strategy
Sector: Residential • Location: United States of America
Source: SAM.gov
Uninterrupted inter-theater airlift capacity is paramount for global operations during fleet recapitalization. Current recapitalization projections require C-5M viability until 2045 and C-17A viability through 2075. Next Generation Airlift (NGAL) will replace both the C-5M and C-17A fleets as the next inter-theater airlift platform. With an accelerated NGAL Analysis of Alternatives (AoA) in FY27 a
- Status
- Closed
- Sector
- Residential, Aerospace & Defense, Commercial, Government
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about C-17 Air Mobility Command Airlift Recapitalization Strategy
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | special notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Uninterrupted inter-theater airlift capacity is paramount for global operations during fleet recapitalization. Current recapitalization projections require C-5M viability until 2045 and C-17A viability through 2075. Next Generation Airlift (NGAL) will replace both the C-5M and C-17A fleets as the next inter-theater airlift platform. With an accelerated NGAL Analysis of Alternatives (AoA) in FY27 and an uninterrupted acquisition process with consistent funding, the first NGAL aircraft could be produced as early as FY38. It is estimated the NGAL program will reach Initial Operational Capability (IOC) in FY41. One NGAL aircraft will replace one C-5M aircraft until the entire C-5M fleet is retired. Then, the C-17A fleet will be replaced by NGAL at a one-for-one swap. To mitigate risks associated with acquisition delays, funding uncertainties, or technological challenges, the existing C-5M and C-17A fleets’ operational viability must be maintained until a fully capable replacement is fielded, which may require extending the service life and associated Military Type Certificate (MTC) of each platform. |
Original sector | Not Identified |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Residential, Aerospace & Defense, Commercial, Government |
Article published date | 2025-11-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
