C1Az--657A4-26-125 Conduct Roof Deck Assessment Building 8 Me Fy27 Nrm
Sector: Residential • Location: United States of America
Source: SAM.gov
657A4-26-125 Conduct Roof Deck Assessment Building The purpose of this modification is to provide clarifications. See below. Additionally, the response date for SF330 submission is extended to 11/4/2026 @ 2:00pm CT to & Clarification to Evaluation Factor 1. ii: The Designers of Record shall perform and direct the design within their respective discipline a
- Status
- Prospective
- Sector
- Residential, Commercial
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about C1Az--657A4-26-125 Conduct Roof Deck Assessment Building 8 Me Fy27 Nrm
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | presolicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 657A4-26-125 Conduct Roof Deck Assessment Building The purpose of this modification is to provide clarifications. See below. Additionally, the response date for SF330 submission is extended to 11/4/2026 @ 2:00pm CT to Abby.Monroe2@va.gov & Matthew.Finley@va.gov Clarification to Evaluation Factor 1. ii: The Designers of Record shall perform and direct the design within their respective discipline and shall sign and seal the drawings. All Designers of Record must be professionally registered in their discipline in a State, the District of Columbia, or an outlying area of the United States shall prepare or review and approve the design of architectural, structural, mechanical, electrical, civil, or other engineering features of the work. Factor 1. iii Each resume shall include a minimum of three (3) and a maximum of five (5) specific completed projects in the past ten (10) years that best illustrate the individual team members experience relevant to this contract scope. Completed projects has been changed from five (5) to ten (10) years 2. SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE Due to this project/assessment not requiring follow on construction, the government will also accept relevant assessment projects that have been completed but did not result in construction or where construction period services were not required. It is acceptable to submit other roof assessment projects. |
Original sector | Professional, Scientific, and Technical Services |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Residential, Commercial |
Article published date | 2026-10-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
