C1Da--657A4-26-104, Conduct Life Safety Review 0004
One of 10,000+ tenders Taiyo tracks in Missouri.
Source: SAM.gov
The purpose of this modification (#4) is to clarify/answer questions. 1. Please confirm whether the primary deliverable is: a. A Life Safety Survey and new life safety drawings, including deficiency identification and updated floor plans -OR- b. A full multi-discipline design, including architectural, mechanical, electrical, plumbing, fire protection/life safety, structural, security, and other sy
- Status
- Closed
- Sector
- Hospital, Residential, Commercial
- Location
- Poplar Bluff, Missouri, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about C1Da--657A4-26-104, Conduct Life Safety Review 0004
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | presolicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The purpose of this modification (#4) is to clarify/answer questions. 1. Please confirm whether the primary deliverable is: a. A Life Safety Survey and new life safety drawings, including deficiency identification and updated floor plans -OR- b. A full multi-discipline design, including architectural, mechanical, electrical, plumbing, fire protection/life safety, structural, security, and other systems, complete with construction documents, specifications, and cost estimates A: You are to provide a life safety survey and new life safety drawings to include deficiency identification. An architectural, mechanical, electrical, plumbing, fire protection/life safety, structural, security and other systems review will need to be completed to ensure all Life Safety Survey items are captured and an accurate deficiency list can be prepared along with the requested cost estimates. The existing life safety drawings will not be provided. 2. If a full design is required, please confirm whether the design will include: Construction documents (drawings + specifications) for all required corrections Detailed cost estimates for each corrective action             Phasing, interim life safety measures, and constructability considerations Submission requirements aligned with PG-18-15 Vol C as for typical NRM/Minor designs      A: You will provide life safety drawings only for each building and will need to identify required corrections. These corrections may include improvements, repairs, and renovations to architectural, mechanical, plumbing, fire protection/life safety, structural, structural, and other systems to our facility which should be captured as part of the identified corrections and the costs associated. Also, detailed cost estimates for each corrective action are required 3. If the intent is a survey-only effort, please clarify which of the following are not required: Architectural, mechanical, electrical, plumbing, or structural design  Architectural drawings/floor plan with life safety features are required. Hazardous materials design/abatement plans      Not required Geotechnical investigation       Not required System performance modeling (e.g., Trane Trace 700)                    Not required Development of a fully operational product beyond life safety drawings        We want a complete accurate set of new life safety drawings 4. Extent of life safety drawings. Please confirm whether new drawings are required for: All buildings listed (main campus + Annex + 6 CBOCs) Only buildings with deficiencies Only updated floor plan sheets + LS sheets per NFPA 101/PG-18-9 format X (All new drawings are new) A: Yes, new drawings are required for all buildings listed END OF MODIFICATION |
Original sector | Professional, Scientific, and Technical Services |
Location
Country | United States of America (USA) |
State | Missouri |
City | Poplar Bluff |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Hospital, Residential, Commercial |
Article published date | 2025-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
