Cablu monofazat de medie tensiune_Retele Electrice Romania SA
Sector: Power Generation (CCGT) • Location: Romania
Source: TED Europa
Se dorește achizitionarea acestor produse in vederea realizarii de noi lucrari de investitii,de modernizare a infrastructurii de retele electrice, prin inlocuirea celor uzate moral sau fizic, in vederea imbunatatirii/cresterii performantei acestora si a maririi gradului de siguranta in alimentare cu energie electrica a consumatorilor Prin achizitia de cablu monofazat de medie tensiune se va asigur
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Romania
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about Cablu monofazat de medie tensiune Retele Electrice Romania SA
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract award notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Se dorește achizitionarea acestor produse in vederea realizarii de noi lucrari de investitii,de modernizare a infrastructurii de retele electrice, prin inlocuirea celor uzate moral sau fizic, in vederea imbunatatirii/cresterii performantei acestora si a maririi gradului de siguranta in alimentare cu energie electrica a consumatorilor Prin achizitia de cablu monofazat de medie tensiune se va asigura continuitatea in alimentare a consumatorilor la reteaua electrica de distributie si racordarea a noi consumatori, se vor indeplini cerintele legislative aplicabile(Ordinul ANRE nr. 36/28.02.2019 privind aprobarea Metodologiei pentru evaluarea condiţiilor de finanţare a investiţiilor pentru electrificarea localităţilor ori pentru extinderea reţelelor de distribuţie a energiei electrice; Ordinul ANRE nr. 59/02.08.2013 pentru aprobarea Regulamentului privind racordarea utilizatorilor la reţelele electrice de interes public). Frecventa contractelor subsecvente ce urmeaza a fi atribuite: conform documentatiei de atribuire. Operatorii economici interesati pot solicita clarificari/informatii suplimentare, pana in a 19-a zi inainte de termenul limita de depunere a ofertelor. In masura in care solicitarile de clarificare au fost adresate in termenul prevazut in anuntul de participare, Entitatea Contractanta va raspunde in mod clar si complet in a 11 a zi inainte de data limita de depunere a ofertelor - conform prevederilor art.172 alin. (2) si 173 alin. (1) din Legea 99/2016 actualizata. |
Original sector | Electrical machinery, apparatus, equipment and consumables; lighting |
Location
Country | Romania |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT) |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in Romania
- Nsf Deveselu Electricity
- „Program off-line pentru realizarea analizelor dinamice și a simulărilor privind stabilitatea SEN”
- Modernizare statii de pompe din spatele digurilor din cadrul SH. Rm. Vâlcea: „SP Topolog de la CHE Babeni, SP Bratia de la CHE Babeni, SP Bistrita de la CHE Babeni, SP Olanu de la CHE Ionesti, SP Oltet de la CHE Ipotesti, SP Poganu de la CHE Strejesti, SP Teslui de la CHE Arcesti, SP Teslui – Farcasele de la CHE Draganesti”
- Surse neîntreruptibile de tensiune (UPS)
- Furnizare stații de încărcare ultrarapide inclusiv montare și punere în funcțiune
- Țevi din PE-Xa preizolate / neizolate și fitinguri neizolate pentru circuitul secundar de încălzire, apa caldă de consum și recirculație
- Servicii de telefonie mobilă și internet mobil – Acord Cadru
- Servicii de implementare New CRM Grids
