Calibration and Certification of Equipment used for Vapor Recovery
The scope, dates and status of this tender. A free account opens every field.
Source: California Purchasing Group
The California Air Resources Board ( CARB ) is seeking a Contractor to conduct NIST traceable calibrations . CARB is required by law to certify vapor recovery systems or components installed in gasoline dispensing facilities ( gas stations ) and to conduct testing to verify vapor recovery systems or components com
- Status
- Closed
- Sector
- Seaport
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about Calibration and Certification of Equipment used for Vapor Recovery
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The California Air Resources Board ( CARB ) is seeking a Contractor to conduct NIST traceable calibrations . CARB is required by law to certify vapor recovery systems or components installed in gasoline dispensing facilities ( gas stations ) and to conduct testing to verify vapor recovery systems or components comply with applicable CARB test procedures . These test procedures require instruments used for testing to be calibrated annually or semiannually and include National Institute of Standards and Technology ( NIST ) traceable certifications to produce valid and accurate results . Contractor shall provide and be responsible for all labor and materials / equipment to perform the services detailed in this Agreement . A . EQUIPMENT Contractor shall perform the services outlined in this Agreement on the equipment at the frequency listed below . The State reserves the right to add equipment similar to the list specified in this Agreement and delete equipment that has become obsolete through a formal amendment . QTY MODEL NUMBER SERIAL NUMBER FREQUENCY 1 Ashcroft ATE - 100 / FM Base Unit 7357 Annual 1 Ashcroft ATE - 100 / FM Base Unit 9213 Annual 1 Ashcroft AQS - 1 / FM Module ; ± 25 in WC ( 0 . 06 % accuracy ) 38723 Annual 1 Ashcroft AQS - 1 / FM Module ; ± 25 in WC ( 0 . 06 % accuracy ) 24260 Annual 1 Ashcroft AQS - 1 / FM Module ; ± 0 . 25 in WC ( 0 . 07 % accuracy ) 24256 Twice Yearly 1 Ashcroft AQS - 1 / FM Module ; ± 0 . 25 in WC ( 0 . 07 % accuracy ) 29084 Twice Yearly 1 Ashcroft AQS - 1 / FM Module ; ± 1 . 0 in WC ( 0 . 06 % accuracy ) 28024 Twice Yearly 1 Ashcroft AQS - 1 / FM Module ; ± 7 . 5 in WC ( 0 . 06 % accuracy ) 28025 Twice Yearly 1 Heise HQS - 1 / FM Module ; ± 3 . 0 in WC ( 0 . 06 % accuracy ) 58307 Twice Yearly 1 Heise HQS - 1 / FM Module ; ± 3 . 0 in WC ( 0 . 06 % accuracy ) 58308 Twice Yearly 1 Ashcroft AQS - 2 / FM Module ; 0 - 1000 mmHg Absolute ( 0 . 025 % accuracy ) 36603 Twice Yearly B . RATES Contractor shall be compensated for all costs associated with the services at the rate specified in Exhibit B , Attachment 1 – Contractor ’ s Rate Sheet . C . LOCATION Services shall be performed at the Contractor ’ s facility , unless otherwise specified . D . REPAIR Repair services are not included in this Agreement . Authorization for parts will be on an individual basis through a separate purchase order . In the event that there is a major instrument malfunction , the Contractor shall contact the Contract Manager for instructions . E . CALIBRATION 1 . Contractor shall perform calibration services on the equipment at the frequency specified in the table above . 2 . CARB shall ship equipment to the Contractor for calibration service in accordance with the Shipment of Equipment section . 3 . Contractor shall ensure all instruments used to calibrate the equipment shall be certified and traceable to the National Institute of Standards and Technology ( NIST ). 4 . Contractor shall identify all calibrated equipment by placing inspection stickers on the equipment . Stickers shall show the date of calibration , and signature of service technician calibrating the equipment . F . PARTS REPLACEMENT Replacement parts are not included in this Agreement and will be authorized only on a piece by piece basis through a separate purchase order . In the event that there is a major instrument malfunction , the Contractor shall contact the Contract Manager for instructions . |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Seaport |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Seaport tenders in United States of America
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Coir Log Furnish InstallRobinwood
- Recreation Supplies Parks Recreation
- Bay Corridor Transmission and Distribution - Phase 3 (2019) ...
- Transmission Line 7/8 Upgrades [BID TABULATION]
- Moccasin Penstock Rehabilitation - BID TABULATION
- New Treasure Island Wastewater Treatment Plant
- San Andreas Reservoir Road Improvements [BID TABULATION]
