Carlton Active
The scope, dates and status of this tender. A free account opens every field.
Source: Contracts Finder
This requirement is a call-off contract using the UK Leisure Frameworkhttps://leisureframework.co.uk/which is a specialist procurement framework supporting leisure centre building.The contract delivers the Carlton Active pre-construction phase (RIBA Stage 2) and will develop the concept design and establish the detailed feasibility for the redevelopment of the Richard Herrod Centre into a new Leis
- Status
- Closed
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Contracts Finder
ConstructChat
Ask ConstructChat about Carlton Active
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | awarded contract |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This requirement is a call-off contract using the UK Leisure Frameworkhttps://leisureframework.co.uk/which is a specialist procurement framework supporting leisure centre building.The contract delivers the Carlton Active pre-construction phase (RIBA Stage 2) and will develop the concept design and establish the detailed feasibility for the redevelopment of the Richard Herrod Centre into a new Leisure, Wellbeing and Community Centre. This stage will define the project brief, confirm the facility mix, undertake technical site surveys, develop outline designs, and prepare the initial cost plan. It will also include early engagement with planning, environmental, and accessibility requirements to inform the concept and secure a clear, deliverable design and budget position for progression to RIBA Stage 3.RIBA 2A Stage Report Pack including:o A detailed Project Execution Plan, outline risk register, and estimated timeline for project delivery.o A robust budget cost estimate.o Planning 'Pre-App' consultations, if applicable.o Review and proposal of any surveys required to develop the RIBA 4 Technical Design.Outline Architectural Information comprising:o Accommodation Schedule.o Site Plans - Existing and Proposed.o General Arrangement (GA) Plans and Sections.o Concept Massing and Elevations.o 3D Visuals of key external and internal spaces.o Outline Performance Specifications.o FF&E Schedule of Assumptions.Production of Structural Information comprising:o Outline Structural Strategy.o Recommendations on the need for further surveys, assessments or investigations.o Recommendations on statutory and legal approvals required.Production of MEP Services Information comprising:o Outline Mechanical and Electrical Strategy.o Outline Performance Specifications for mechanical, electrical and public health systems.o Preliminary plant space and services distribution layouts (including pool filtration).o Cost confidence MEP cost plan (based on £/m² indicative outline solutions).o Attendance at meetings (site-based or virtual) with coordination between consultants and key subcontractors. |
Location
Country | United Kingdom (UK) |
Source
Source | Contracts Finder |
URL |
More Details
Record type | Tender |
Article published date | 2025-12-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More infrastructure tenders in United Kingdom
- Submarine HV cable rock protection
- Submarine HV cable rock protection
- 2024-01-05 09:00 - QBE129 Haverhill to Riverwalk School, Bury St Edmunds
- Usługa kompleksowej organizacji udziału przedsiębiorstw z województwa łódzkiego w charakterze wystawców na targach branży spożywczej IFE 2026
- Tender for Play Area Works within the Borough of Ards and North Down
- SUMIT Project Hardware and Connectivity Services
- Laboratory Consumables and Chemicals
- OSPAR Relational Database for the implementation of Recommendations on the List of threatened and/or declining habitats and species
