Carpet Replacement - 17th Circuit Court
Closed · MITN · Last reported Feb 2026
Source: MITN Purchasing Group
1 . Carpet Specifications : shown in Exhibit A 2 . Baseboard Specifications : shown in Exhibit B , if the product is discontinued , a comparable product must be used . 3 . All floor preparation , including removal and disposal of existing flooring , cleaning of debris and scarification , if necessary , will be the resp
- Status
- Closed
- Sector
- Telecommunications, Commercial, Cement, Residential
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Carpet Replacement - 17th Circuit Court
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . Carpet Specifications : shown in Exhibit A 2 . Baseboard Specifications : shown in Exhibit B , if the product is discontinued , a comparable product must be used . 3 . All floor preparation , including removal and disposal of existing flooring , cleaning of debris and scarification , if necessary , will be the responsibility of the successful Respondent . 4 . Carpet tile shall be glued in accordance with and using a recognized brand of adhesive recommended by the carpet manufacturer . The floor contains a Walker Duct Wire Management System and these areas MUST be adhered with a “ releasable ” adhesive . The Respondent shall specify the brand and type of glue to be used and shall provide a Safety Data Sheet ( SDS ) with the quote response . Installation shall lay flat and be free of bubbles and not move when subject to traffic . 5 . Any carpet and vinyl wall base within the work area shall be included . 6 . Material storage shall be the responsibility of the successful Respondent . There is limited , unsecured space to store the material on - site . 7 . The flooring substrate is concrete . 8 . It will be the responsibility of the Respondent to elevate and install beneath modular office systems and to move furniture as needed ( i . e . conference tables , desks , file cabinets , seating , etc .) and move back / restore to original location furniture after installation is completed . 9 . Owner will be responsible for disconnecting and re - connecting computers , phones and / or miscellaneous technology cabling . 10 . It is the responsibility of the Respondent to obtain accurate measurements . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Telecommunications, Commercial, Cement, Residential |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
