logo

Catch Basin and Inlet Cleaning

Bids closed Mar 2026 · Illinois · Last reported Mar 2026

Source: Illinois Purchasing Group

Tender
Closed

DESCRIPTION OF WORK The Contractor will be responsible for the cleaning of designated inlet and catch basin structures . After the cleaning of the structures , a condition assessment of each structure will be recorded . The structures will be identified by street name and number . MAPS The Village will provid

Status
Closed
Sector
Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Car parking
Location
Illinois, United States of America
Updated
3 Nov 2026
Source
Illinois Purchasing Group

ConstructChat

Ask ConstructChat about Catch Basin and Inlet Cleaning

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Catch Basin and Inlet Cleaning” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Illinois, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

DESCRIPTION OF WORK The Contractor will be responsible for the cleaning of designated inlet and catch basin structures . After the cleaning of the structures , a condition assessment of each structure will be recorded . The structures will be identified by street name and number . MAPS The Village will provide sewer atlas maps indicating where work is to be performed . These maps will be returned at the completion of the project . HYDRANT PERMIТ The Village will provide the Contractor with a fire hydrant permit and the water necessary to carry out the specified cleaning work . The Contractor must adhere to the rules listed on the fire hydrant permit form . DUMP SITE The Village will provide a dumpsite for all debris collected during the specified work . The dumpsite will be open from 7 : 00 A . M . to 3 : 30 P . M . during normal working days . The Contractor ' s vehicles must be empty when they arrive in the Village ; no debris can be dumped from other jobs . The Contractor will be responsible for maintaining the proper drainage of the drying bed system . THIS WORK SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT . PERSONNEL The Contractor will provide all necessary personnel required for the operation of each piece of equipment utilized for video taping and for the light cleaning , root cleaning and cleaning of the catch basin and inlet drainage structures . EQUIPMENT STORAGE / PARKING The Village will provide the Contractor with a parking area to accommodate the Contractor ' s equipment , vehicles , and other materials during the contract period . The Village will not be responsible or liable for any damage or theft of these items at any time . PROTECTION & SAFETY 7 . 1 The Contractor will be responsible for posting NO PARKING signs and must notify the Village of locations where NO PARKING signs are posted . The Village will supply the contractor with the NO PARKING signs . After the work is completed the Contractor ' s crew who completed the work shall be responsible for the immediate removal of the N0 PARKING signs . All signs shall be returned to the Village at the end of the project . 7 . 2 The Contractor will be solely responsible for the safety and protection of its employees and workers against accidents by utilizing proper barricades , lights , and other approved methods of traffic control . All traffic control will be the responsibility of the Contractor , and must be executed in accordance with all IDOT requirements . All costs associated with traffic control are to be included in the unit prices and will be considered as incidental to performing the required work . 7 . 3 The Contractor shall be solely responsible for the safety of its work force . The Contractor shall utilize safety harnesses , gas detectors , and other appropriate equipment utilized in sewer work , and shall maintain a first aid station . The Contractor is solely responsible for the safety and training of its staff in confined space entry . 7 . 4 The Contractor shall contact all other utilities which will be affected by its operations and notify the owners of the utilities of its operations and their limits within forty - eight ( 48 ) hours prior to beginning construction . The Contractor shall be responsible for damage to utilities and shall , at its own expense , restore such property to a condition equal to that in existence prior to the commencement of work , as may be directed by the owners . 8 . 0 SUPERVISION 9 . 0 The Contractor is solely responsible for the supervision of its work crews . At a minimum a supervisor must inspect the crews three times a week to insure proper execution of the contract . The Contractor ' s supervisor must update the Water & Sewer Division management after each visit with their crews . To ensure successful completion of this contract , the Village reserves the right to request a higher level of field supervision .

Location

Country

United States of America (USA)

State

Illinois

Source

Source

Illinois Purchasing Group

URL

More Details

Record type

Tender

Sector

Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Car parking

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender