Catch Basin and Inlet Cleaning
Bids closed Mar 2026 · Illinois · Last reported Mar 2026
Source: Illinois Purchasing Group
DESCRIPTION OF WORK The Contractor will be responsible for the cleaning of designated inlet and catch basin structures . After the cleaning of the structures , a condition assessment of each structure will be recorded . The structures will be identified by street name and number . MAPS The Village will provid
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Car parking
- Location
- Illinois, United States of America
- Updated
- 3 Nov 2026
- Source
- Illinois Purchasing Group
ConstructChat
Ask ConstructChat about Catch Basin and Inlet Cleaning
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | DESCRIPTION OF WORK The Contractor will be responsible for the cleaning of designated inlet and catch basin structures . After the cleaning of the structures , a condition assessment of each structure will be recorded . The structures will be identified by street name and number . MAPS The Village will provide sewer atlas maps indicating where work is to be performed . These maps will be returned at the completion of the project . HYDRANT PERMIТ The Village will provide the Contractor with a fire hydrant permit and the water necessary to carry out the specified cleaning work . The Contractor must adhere to the rules listed on the fire hydrant permit form . DUMP SITE The Village will provide a dumpsite for all debris collected during the specified work . The dumpsite will be open from 7 : 00 A . M . to 3 : 30 P . M . during normal working days . The Contractor ' s vehicles must be empty when they arrive in the Village ; no debris can be dumped from other jobs . The Contractor will be responsible for maintaining the proper drainage of the drying bed system . THIS WORK SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT . PERSONNEL The Contractor will provide all necessary personnel required for the operation of each piece of equipment utilized for video taping and for the light cleaning , root cleaning and cleaning of the catch basin and inlet drainage structures . EQUIPMENT STORAGE / PARKING The Village will provide the Contractor with a parking area to accommodate the Contractor ' s equipment , vehicles , and other materials during the contract period . The Village will not be responsible or liable for any damage or theft of these items at any time . PROTECTION & SAFETY 7 . 1 The Contractor will be responsible for posting NO PARKING signs and must notify the Village of locations where NO PARKING signs are posted . The Village will supply the contractor with the NO PARKING signs . After the work is completed the Contractor ' s crew who completed the work shall be responsible for the immediate removal of the N0 PARKING signs . All signs shall be returned to the Village at the end of the project . 7 . 2 The Contractor will be solely responsible for the safety and protection of its employees and workers against accidents by utilizing proper barricades , lights , and other approved methods of traffic control . All traffic control will be the responsibility of the Contractor , and must be executed in accordance with all IDOT requirements . All costs associated with traffic control are to be included in the unit prices and will be considered as incidental to performing the required work . 7 . 3 The Contractor shall be solely responsible for the safety of its work force . The Contractor shall utilize safety harnesses , gas detectors , and other appropriate equipment utilized in sewer work , and shall maintain a first aid station . The Contractor is solely responsible for the safety and training of its staff in confined space entry . 7 . 4 The Contractor shall contact all other utilities which will be affected by its operations and notify the owners of the utilities of its operations and their limits within forty - eight ( 48 ) hours prior to beginning construction . The Contractor shall be responsible for damage to utilities and shall , at its own expense , restore such property to a condition equal to that in existence prior to the commencement of work , as may be directed by the owners . 8 . 0 SUPERVISION 9 . 0 The Contractor is solely responsible for the supervision of its work crews . At a minimum a supervisor must inspect the crews three times a week to insure proper execution of the contract . The Contractor ' s supervisor must update the Water & Sewer Division management after each visit with their crews . To ensure successful completion of this contract , the Village reserves the right to request a higher level of field supervision . |
Location
Country | United States of America (USA) |
State | Illinois |
Source
Source | Illinois Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Car parking |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
