CCA - CONCRETE POLISH DRILL HALL & HALLWAYS
The scope, dates and status of this tender. A free account opens every field.
Source: Nevada Purchasing Group
General Intention : This Scope of Work is intended to include all work required to complete the tasks described below . Task ( s ): The contractor shall perform concrete polishing in the drill hall and hallways , all related required materials and accessories to perform project completion of the polishing the c
- Status
- Closed
- Sector
- Commercial, Cement, Residential
- Location
- Nevada, United States of America
- Updated
- 3 Nov 2026
- Source
- Nevada Purchasing Group
ConstructChat
Ask ConstructChat about CCA - CONCRETE POLISH DRILL HALL & HALLWAYS
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | General Intention : This Scope of Work is intended to include all work required to complete the tasks described below . Task ( s ): The contractor shall perform concrete polishing in the drill hall and hallways , all related required materials and accessories to perform project completion of the polishing the concrete floor in the lobby , drill hall , ( 5 ) hallways . Polishing services shall include , but are not limited to : a ) Remove existing tile from the lobby area . b ) Remove existing epoxy coating in the drill hall area . c ) Remove VCT tile and glue from the ( 4 ) hallways / corridor areas . d ) One hallway area has no existing coating . e ) Installation of transition strips in doorways areas were needed . f ) Remove existing rubber / vinyl cove from walls . g ) Prep all areas and polish to a high - shine finish . h ) Clean all areas . i ) Patch any voids , cracks , and chips in flooring . j ) Install a new 5 ” or 6 ” vinyl cove base . k ) Relocation of any furniture or equipment will be done by the Office of the Military . l ) Contractor is responsible for supplying a dumpster and will need to work with the facility supervisor on the location of the dumpster . m ) Contractor is responsible for keeping dust control as much as possible . n ) Contractor is responsible for cleaning up all slurry splatter when prepping concrete flooring . o ) Contractor is responsible for all material and related debris from this project must be removed from plot boundaries . |
Location
Country | United States of America (USA) |
State | Nevada |
Source
Source | Nevada Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Commercial, Cement, Residential |
Article published date | 2026-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
