logo

CDC Entrance Canopy Replacement

One of 10,000+ tenders Taiyo tracks in Oregon.

Source: Oregon Purchasing Group

Tender
Closed

... 2 . 5 HARDWARE A . Material : Steel . B . Manufacturing Standard : ASTM A - 36 . C . Finish : • Hot dip galvanized in accordance with ASTM A 123 . D . Extent of Work : Provide all required for erection and final assembly . 2 . 6 FABRICATION A . Follow Referenced Specifications . B . In any Members subject to bending a

Status
Closed
Sector
Manufacturing (Industrial), Water Supply and Storage, Forest Products and Packaging, Steel, Commercial
Location
Oregon, United States of America
Updated
3 Nov 2026
Source
Oregon Purchasing Group

ConstructChat

Ask ConstructChat about CDC Entrance Canopy Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “CDC Entrance Canopy Replacement” is a tender record in Taiyo, linked to the Manufacturing (Industrial) sector. It is issued for works, goods, or services related to Oregon, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

... 2 . 5 HARDWARE A . Material : Steel . B . Manufacturing Standard : ASTM A - 36 . C . Finish : • Hot dip galvanized in accordance with ASTM A 123 . D . Extent of Work : Provide all required for erection and final assembly . 2 . 6 FABRICATION A . Follow Referenced Specifications . B . In any Members subject to bending and spanning continuously over more than 2 Supports provide Tension Laminations complying with AITC requirements in both Top and Bottom Laminations as necessitated by flexural configuration of Member . C . AITC 110 Appearance Grade : • Where Exposed to View : Architectural . • Where Concealed from View : Architectural . D . Surface Texture : Sand smooth . • Where Concealed from View : Sand or plane smooth at Fabricator ' s option E . If and where exposed Framing Connectors are recessed into Member , make neat and accurately sized Cuts , Kerfs , and Holes to receive Connector . Do not oversize Cuts , Kerfs , or Holes . F . Except where shown on Drawings or otherwise approved , do not notch or drill members . 2 . 7 SHOP TREATMENT A . Follow Referenced Specifications , unless otherwise specified herein . B . Member Ends : Treat with End Sealer . C . Surfaces to remain exposed : Treat with Sealer . D . All other Surfaces : Treat with Clear Sealer . 2 . 8 FINISH A . Where exposed to view : Stain , see Section 09 90 00 . 2 . 9 PROTECTIVE WRAP A . Material : Water - resistant Reinforced Paper . B . Extent of Work : Individually wrap each Member ...

Location

Country

United States of America (USA)

State

Oregon

Source

Source

Oregon Purchasing Group

URL

More Details

Record type

Tender

Sector

Manufacturing (Industrial), Water Supply and Storage, Forest Products and Packaging, Steel, Commercial

Article published date

2026-04-08

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender