Center Point Road Bridge Over CN Railroad Bridge Deck Overlay
One of 7,519 tenders Taiyo tracks in Iowa.
Source: City of Cedar Rapids
Project Description:The Public Improvement, upon which bids are requested, generally consists of bridge deck patching and concrete overlay, concrete repair to bridge elements, pavement approach repair, and guardrail replacement, located at the bridge over CN Railroad on Center Point Rd NE between 51st Street NE and Town Lane NE. The Engineer’s opinion of probable cost is $650,000.Early Start Date:
- Status
- Bidding
- Sector
- Road, Rail, Cement, Bridge
- Location
- Cedar Rapids, Iowa, United States of America
- Updated
- 3 Nov 2026
- Source
- City of Cedar Rapids
ConstructChat
Ask ConstructChat about Center Point Road Bridge Over CN Railroad Bridge Deck Overlay
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | issued |
Taiyo status | Bidding |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Project Description:The Public Improvement, upon which bids are requested, generally consists of bridge deck patching and concrete overlay, concrete repair to bridge elements, pavement approach repair, and guardrail replacement, located at the bridge over CN Railroad on Center Point Rd NE between 51st Street NE and Town Lane NE. The Engineer’s opinion of probable cost is $650,000.Early Start Date:Upon notice to proceedLate Start Date:4/5/27Milestones:NoneFinal Completion:Completion Date - 6/30/27Project Phasing:This project will be split into two phases with the first phase being all work items under the bridge deck and the second phase being all work on the bridge deck (potentially including under the bridge deck) or roadway items. The contractor may only work on the items under the bridge before the winter shut down date (optional) but will be allowed to complete the entire project in the spring if desired. If work under the bridge deck is started prior to winter, it must be completed in its entirety. Concrete overlay work and any other phase two work will only be allowed after winter shutdown is complete. The bridge must remain open during winter shutdown. |
Location
Country | United States of America (USA) |
State | Iowa |
City | Cedar Rapids |
Source
Source | City of Cedar Rapids |
URL |
More Details
Record type | Tender |
Sector | Road, Rail, Cement, Bridge |
Article published date | 2026-08-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo