Central Plant Controls Automation
One of 10,000+ tenders Taiyo tracks in Texas.
Source: Texas SmartBuy
The existing Central Plant direct digital control (DDC) system is deficient in meeting moder automation and energy efficiency standards. Currently, no functional automatic sequence is available, forcing operators to manage the chiller plant manually. This situation, combined with outdated controllers and limited processing capabilities, significantly hinders efforts to maintain optimal performance
- Status
- Closed
- Sector
- Power Generation (CCGT), Water Supply and Storage, Education
- Location
- Texas, United States of America
- Updated
- 3 Nov 2026
- Source
- Texas SmartBuy
ConstructChat
Ask ConstructChat about Central Plant Controls Automation
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | posted |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The existing Central Plant direct digital control (DDC) system is deficient in meeting moder automation and energy efficiency standards. Currently, no functional automatic sequence is available, forcing operators to manage the chiller plant manually. This situation, combined with outdated controllers and limited processing capabilities, significantly hinders efforts to maintain optimal performance and impedes the implementation of energy-saving strategies. Additionally, a shortage of plant operators exacerbates the risk of operational disruptions, since continuous manual oversight is required in absence of a reliable automated sequence of operation (SOO)> To address these critical issues, a comprehensive DDC upgrade is planned. New controllers with enhanced processing power and memory will replace existing units, and a more resilient network architecture will be implemented. This upgrade will enable fully automated chiller plant operations while preserving manual override capabilities as needed. The project scope includes improvements to the chiller water, condenser water, and ancillary plant systems, excluding steam production systems. |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source | Texas SmartBuy |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT), Water Supply and Storage, Education |
Article published date | 2026-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in United States of America (USA)
- Electrical Maintenance and Non-structural Construction Services at John F. Kennedy International Airport – Four (4) Year Work Order Contract
- LGA-124.267 (RFx 7 257) - (ADV) - LaGuardia Airport - Rehabilitation of Pump House Electrical System
- Bid 6000001711 - Aeronautical Edge Lighting Equipment and Spare Parts, as Mfd. by O.C.E.M. Acquisition Corp., d/b/a Multi Electric Manufacturing, Inc. to Various Warehouses in NY and NJ - One (1) Year Requirements Contract
- GWB-244.289 (RFx 7 300) - (ADV) - George Washington Bridge - Rehabilitation of Center Avenue and Lemoine Avenue Bridges
- PAT-774.221 (RFx 7 220) - (FTA) - (ADV) - PATH - Exchange Place Pump Room and Infrastructure Replacement
- JFK-194.015 (RFx 7 275) - (ADV) - John F. Kennedy International Airport - Replacement of AOA Guard Post Barriers
- Port Newark - Port Street Corridor Improvements
- ONE (1) 2015 FOUR-DOOR 4WD LARGE UTILITY VEHICLE
