Scope of Work [ RO1 ] The Work to be done under the Contract shall consist of the installation of a new force main system . The complete scope is described within the applicable Specifications and Drawings . SPEC NOTE : Insert a concise description of the Work . The major components of the Work are as f

Tender Information FAQ

Tender Information

5 Q
The tender "CentrePort South Regional Water and Wastewater Servicing - Phase 1A Contract 2A" is a Tender record in Taiyo, linked to the Commercial, Mass Transit, Water Supply and Storage, Education, Power Transmission, Rail, Road, Steel, Tunnel, Waste Processing and Treatment, Power Generation (CCGT), Metal, Manufacturing (Industrial), Government sector. It is issued for works, goods, or services related to the local region, Manitoba, Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

open

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Scope of Work [ RO1 ] The Work to be done under the Contract shall consist of the installation of a new force main system . The complete scope is described within the applicable Specifications and Drawings . SPEC NOTE : Insert a concise description of the Work . The major components of the Work are as follows : Utility locations and elevations are to be confirmed prior to commencement of construction as required to allow for preventative or corrective actions if required ; Temporary modifications to existing ditches within working and laydown areas as required to deal with drainage throughout the duration of construction ; Construction of 450 mm DR25 PVC force main utilizing open cut and Trenchless installation methods ; Construction of Combined Air Valve ( CAV ) Chambers ; Construction of 450mm Gate Valves ; Construction of 600 mm DR9 HDPE force main with Primus Liner for the CPKC railway and Omand ’ s Creek crossing utilizing horizontal direction drilling ; Construction of 450 mm DR18 Restrained Joint PVC force main encased within a 900mm Steel Casing for the CN railway , Bergen Cutoff Road , and Oak Point Highway crossings utilizing Auger Boring or Pipe Ramming ; Construction of 1200mm wastewater sewer that crosses the Inkster Blvd and Brookside Blvd Intersection utilizing Tunnelling ; Supporting and backfilling below key utilities to support Tunnelling Work as shown on Drawings ; Connection to the 1350mm CONC WWS at the intersection of Inkster Boulevard and Brookside Boulevard ; Construction of Wastewater Sewer Manholes ; Relocating 300 mm water main as shown on the Drawings ; Coordination of the relocation of existing Telus utilities ; Supporting existing utilities as required Pigging and pressure testing the force main ; and Surface restoration and related Works . SPEC NOTE : Delete D4 . 3 ( a ) if not required ( buildings less than 500 sq . metres ) The following shall apply to the Work : City of Winnipeg Green Building Policy : New City - Owned Buildings and major additions ; http :// clkapps . winnipeg . ca / DMIS / DocExt / ViewDoc . asp ? DocumentTypeId = 2 & DocId = 5989 Universal Design Policy http :// clkapps . winnipeg . ca / DMIS / DocExt / ViewDoc . asp ? DocumentTypeId = 2 & DocId = 3604 [ RO1 ] Tristan , These two items ( deleted from the removed design intent section ) can be added to the Scope of work . Make sure we have an excavating and grading item on the form B to address the ditch regrading comment below ( i ) Utility locations and elevations are to be confirmed prior to commencement of construction as required to allow for preventative or corrective actions if required . ( ii ) Temporary modifications to existing ditches within working and laydown areas as required to deal with drainage throughout the duration of construction . See more

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data