Certified Contractor for Emergency Demolition Services
One of 10,000+ tenders Taiyo tracks in New Jersey.
Source: New Jersey Purchasing Group
The contractor is responsible for demolishing the specific structures and removing the resulting debris , as well as any associated outbuildings on the property . Remove structural framing members and lower to ground by utilizing a method suitable to avoid free fall and to prevent ground impact or dust gene
- Status
- Closed
- Sector
- Road, Power Transmission, Power Generation (CCGT), Car parking, Automotive
- Location
- New Jersey, United States of America
- Updated
- 3 Nov 2026
- Source
- New Jersey Purchasing Group
ConstructChat
Ask ConstructChat about Certified Contractor for Emergency Demolition Services
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The contractor is responsible for demolishing the specific structures and removing the resulting debris , as well as any associated outbuildings on the property . Remove structural framing members and lower to ground by utilizing a method suitable to avoid free fall and to prevent ground impact or dust generation . Where work is adjacent to a street , the contractor shall conduct the Work in a manner that will avoid the accumulation of debris from its operations on the traffic areas of the adjacent street or roadways . Contractor shall continuously remove such accumulations and where necessary broom or wet down traffic areas to prevent dust . NJ State and NJ DEP guidelines must be followed for the removal of hazardous materials such as asbestos , etc . It shall be the contractor ’ s responsibility to remove and dispose of , from the site , all materials in accordance with State and Local guidelines , ordinance and codes . The contractor is responsible for collecting and transporting debris . All truck hauling must comply with NJDOT regulations . After being loaded in the work area , trucks shall have their loads trimmed so that no debris extends horizontally beyond the bed in any direction . The contractor is responsible for giving adequate notice to utility companies for the disconnection of their utilities . No work shall commence until approval in writing from the utility companies by the Construction Official that disconnections have been made . No equipment or materials shall be placed in or on any sidewalk , driveway , street or public thoroughfare , without the approval of the Police department . Completely remove below - grade construction , including foundation walls , footings , driveways and walkways . Below - grade areas and voids resulting from demolition of the structure shall be filled with selected backfill and graded to grade level . |
Location
Country | United States of America (USA) |
State | New Jersey |
Source
Source | New Jersey Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Power Transmission, Power Generation (CCGT), Car parking, Automotive |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
