logo

Ces Expansion Ups Upgrade

The scope, dates and status of this tender. A free account opens every field.

Source: SAM.gov

Tender
Solicitation

The 183d Wing (183WG) at the Abraham Lincoln Capital Airport, Air National Guard Base, Springfield, IL, has a requirement for a firm-fixed-price construction contract to upgrade the Uninterrupted Power Supply (UPS) system in Building 8. SITE VISIT - 11 AUG 2026 @ 1300. The contractor shall provide all personnel, eq

Status
Prospective
Sector
Airport, Power Generation (CCGT), Residential, Aerospace & Defense, Manufacturing (Industrial), Commercial
Location
Springfield, Illinois, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Ces Expansion Ups Upgrade

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Ces Expansion Ups Upgrade” is a tender record in Taiyo, linked to the Airport sector. It is issued for works, goods, or services related to Springfield, Illinois, United States of America.

Participants

Not available for this record.

Status

Original status

solicitation

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

*Edit 8/12/26 - added Slides and Minutes from Pre-Quote Conference and Site Visit.* The 183d Wing (183WG) at the Abraham Lincoln Capital Airport, Air National Guard Base, Springfield, IL, has a requirement for a firm-fixed-price construction contract to upgrade the Uninterrupted Power Supply (UPS) system in Building 8. SITE VISIT - 11 AUG 2026 @ 1300. The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and non-personal services necessary to remove the existing 10 kW UPS system and install a new scalable 20 kW UPS system. Key scope items include: Demolition and removal of one (1) existing 10 kW Liebert EXM UPS in SWITCH Room 118, including associated equipment and maintenance bypass panelboard. Site and electrical preparation for the new system. Installation of one (1) new scalable 20 kW UPS System (configured for 20 kVA/kW, scalable up to 30 kVA/kW for future expansion). Sealing of all wall/floor/ceiling penetrations to meet existing fire and assembly ratings. Full system adjustments, load balancing, and operational testing by factory-trained field service personnel. Period of Performance: 120 days or less after issuance of Notice to Proceed (NTP). See Solicitation for additional information.

Original sector

Construction

Location

Country

United States of America (USA)

State

Illinois

City

Springfield

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Airport, Power Generation (CCGT), Residential, Aerospace & Defense, Manufacturing (Industrial), Commercial

Article published date

2026-08-13

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender